column
Failure control technique of oil & gas pipeline
Li Helin
2011, 30(6): 401-410.
Abstract FullText HTML PDF
Study progress in variable speed pig for natural gas pipeline
Tan Guibin, Zhu Xiaoxiao, Zhang Shimin,
2011, 30(6): 411-416.
Abstract FullText HTML PDF
Application of automatic recirculation valve in pump system protection
Zhao Laihui
2011, 30(6): 417-418.
Abstract FullText HTML PDF
Thermodynamic and hydraulic characteristics of hot oil pipeline under the intermittent transportation process
Liu Xin, Zhang Jinjun, Yu Bo
2011, 30(6): 419-422. DOI: CNKI:13-1093/TE.20110614.1542.002
Abstract FullText HTML PDF
Investigation on phase behavior of the pipelining natural gas
Wang Wei, Zhang Xiaoping, Li Ming, ,
2011, 30(6): 423-426.
Abstract FullText HTML PDF
Analysis of erosion fracture stress of 90° elbow in multi-phase mixed transmission pipeline
Du Mingjun, Zhang Zhenting, Zhang Chaoyang, , ,
2011, 30(6): 427-430. DOI: CNKI:13-1093/TE.20110614.1535.001
Abstract FullText HTML PDF
Application of node analysis in dynamic analysis of underground gas storage filling system
Li Mingchuan, Huang Quanhua, Sun Lei
2011, 30(6): 431-434. DOI: CNKI:13-1093/TE.20110614.1601.003
Abstract FullText HTML PDF
The operation parameter computation of Huatugou-Golmud Oil Pipeline with a throughput of 400×104 t/yr
Jiang Yuzhuo, Yu Fangyong
2011, 30(6): 435-437.
Abstract FullText HTML PDF
Safety and environmental protection on construction and operation of olefin pipeline
Hou Xuerui, Zhang Yancai, Li Zhen, ,
2011, 30(6): 438-440.
Abstract FullText HTML PDF
Reason analysis on pipe fracture in hydrotest during water draining for a newly-built pipeline with great fall
Luo Jinheng, Yang Fengping, Ma Qiurong, , ,
2011, 30(6): 441-444.
Abstract FullText HTML PDF
Programs comparison and construction of the Yesanhe River Overhead Crossing NG Project of Sichuan-to-East Gas
Gao Hedong, Qi Zhijiang, Ren Jinling, , ,
2011, 30(6): 445-448.
Abstract FullText HTML PDF
Application of pipe lifting methodology in the pipeline across the goaf
Yao Huiquan, Feng Wei
2011, 30(6): 449-452.
Abstract FullText HTML PDF
Seismic analysis on the truss overhead crossing pipeline across high-intensity earthquake area
Hu Daohua, Yang Xiaoqiu
2011, 30(6): 453-455.
Abstract FullText HTML PDF
The leakage in relief valve of oil pipeline and solutions
Lu Lianyong, Zhang Minghong, Wang Jinlu
2011, 30(6): 456-457.
Abstract FullText HTML PDF
Practice of in-service tank cleaning of crude oil tank
Zhou Huiping, Wang Kai, Hu Jiangfeng
2011, 30(6): 458-459.
Abstract FullText HTML PDF
Apply variable frequency pump system to transport ultra-throughput crude oil
Fu Xiuyong, Chen Chao, Cui Xinhui
2011, 30(6): 460-464.
Abstract FullText HTML PDF
Measures in surge control in Santanghu Oil Pipeline
Fang Aiguo, Xue Haihong
2011, 30(6): 465-466.
Abstract FullText HTML PDF
Freezing bulge analysis and countermeasures for gas pipeline
Zheng Xiaoming, Wang Xiaoyan, Yan Jie,
2011, 30(6): 467, 471.
Abstract FullText HTML PDF
Seal failure causes and prevention measures of inner floating deck of oil tank
Nie Shiquan, Cui Zhenxing, Wang Weifeng
2011, 30(6): 468-471.
Abstract FullText HTML PDF
Construction technique in Chaozhou LPG Freezer of Guangdong Province
Tang Ping, Guan Yongzhi, Shi Rui,
2011, 30(6): 472-473.
Abstract FullText HTML PDF
Optimization of remote control system of Yanchi Compressor Station in West-to-East Gas Transmission Pipeline
Wei Kai, Tang Shanhua, Yan Feng,
2011, 30(6): 474-475, 477. DOI: CNKI:13-1093/TE.20110314.1123.000
Abstract FullText HTML PDF
Technical transform on the drainage system of steel dome-roof oil tank
Liu Hong, Li Guangliang, Nan Shuting
2011, 30(6): 476-477.
Abstract FullText HTML PDF
Application of oil contamination recovery unit of tankfarm
Ma Guoguang, Liu Su, Lin Hui, , ,
2011, 30(6): 478-479.
Abstract FullText HTML PDF