column
Risk-based Process of Repair and Emergency Response of Oil/Gas Pipelines
CHEN Liqiong, ZHANG Peng, , ,
2009, 28(7): 1-5. DOI: 10.6047/j.issn.1000-8241.2009.07.001
Abstract FullText HTML PDF
Fatalness Assessment on Working Conditions of LNG Receiving Terminal
MENG Qingping
2009, 28(7): 5-7. DOI: 10.6047/j.issn.1000-8241.2009.07.002
Abstract FullText HTML PDF
Actualities and Development in Study of Multiphase Mixing Transportation Process for Offshore Pipelines
SHI Baocheng, FU Zaiguo
2009, 28(7): 8-10. DOI: 10.6047/j.issn.1000-8241.2009.07.003
Abstract FullText HTML PDF
Technology Route to Integrity Management of Pipeline Facilities
SHUI Biyuan, AI Muyang,
2009, 28(7): 11-14. DOI: 10.6047/j.issn.1000-8241.2009.07.004
Abstract FullText HTML PDF
Preliminary Failure Evaluation on Spiral Seam Defects of Pipeline
ZHU Jian, WANG Lijun, , , , , , ,
2009, 28(7): 15-20. DOI: 10.6047/j.issn.1000-8241.2009.07.005
Abstract FullText HTML PDF
Finite Element Method to Calculate Extreme Pressure of Internal Corroded Pipeline
DUAN Qingquan, YU Guopeng,
2009, 28(7): 21-23. DOI: 10.6047/j.issn.1000-8241.2009.07.006
Abstract FullText HTML PDF
Short Way to Converse Performance of Centrifugal Pumps
SUN Wei, WANG Yuchun
2009, 28(7): 24-26. DOI: 10.6047/j.issn.1000-8241.2009.07.007
Abstract FullText HTML PDF
Numerical Simulation on Post-Earthquake Leakage and Diffusion of Gas Pipeline and Countermeasures'Study
LIU Wu, XU Yuan, , , ,
2009, 28(7): 27-31. DOI: 10.6047/j.issn.1000-8241.2009.07.008
Abstract FullText HTML PDF
Application of Improved Genetic Algorithm in Optimal Operation of Long-distance Natural Gas Pipelines
JIANG Yi, CHEN Cichang,
2009, 28(7): 32-35. DOI: 10.6047/j.issn.1000-8241.2009.07.009
Abstract FullText HTML PDF
Deduction on Equation of Water Ratio in Oil with Microwave Method
WU Guozhong, MU Lei, ,
2009, 28(7): 35-37. DOI: 10.6047/j.issn.1000-8241.2009.07.010
Abstract FullText HTML PDF
Study of Gas Peak Shaving Way for Zhaodong City
HONG Lina, CHEN Baodong,
2009, 28(7): 38-40. DOI: 10.6047/j.issn.1000-8241.2009.07.011
Abstract FullText HTML PDF
Prediction and Prevention of Corrosion in Gathering Lines of Yakela Condensate Gasfield
YANG Jing, YE Fan
2009, 28(7): 40-43. DOI: 10.6047/j.issn.1000-8241.2009.07.012
Abstract FullText HTML PDF
Corrosion Analysis of Water Reinjection Pipeline in Oilfield and Prevention Method
ZUO Jingluan, REN Shaoran, , , , ,
2009, 28(7): 44-47. DOI: 10.6047/j.issn.1000-8241.2009.07.013
Abstract FullText HTML PDF
Comparison and Analysis on Technology Standards of 3PE Coating of Pipelines
ZHANG Feng, ZHAO Jun, , , , ,
2009, 28(7): 48-51. DOI: 10.6047/j.issn.1000-8241.2009.07.014
Abstract FullText HTML PDF
Development of ϕ1219 Pneumatic Internal Clamp of Pipelines with Copper Liners
LIANG Junzhi, WU Jiangqiao,
2009, 28(7): 52-54. DOI: 10.6047/j.issn.1000-8241.2009.07.015
Abstract FullText HTML PDF
Testing and Analysis of Operation Efficiency for Gas Compressor Sets
LI Yunjie, ZHAO Tangyu, , , ,
2009, 28(7): 55-57. DOI: 10.6047/j.issn.1000-8241.2009.07.016
Abstract FullText HTML PDF
Flowrate Control for Frequency and Inverter Pumps in Parallel Operation
LI Chunning
2009, 28(7): 57-59. DOI: 10.6047/j.issn.1000-8241.2009.07.017
Abstract FullText HTML PDF
Large-scale Flow Loop Experiment and Analysis on Temperature Drop of Buried Hot Oil Pipeline after Shutdown
CUI Xiuguo, JIANG Baoliang, , , , , , ,
2009, 28(7): 59-62. DOI: 10.6047/j.issn.1000-8241.2009.07.018
Abstract FullText HTML PDF
Application of In-line Stoppling Technology in Gas Transmission Pipeline
NIU Jianzhuang
2009, 28(7): 63-66. DOI: 10.6047/j.issn.1000-8241.2009.07.019
Abstract FullText HTML PDF
Considerations of On-site Construction Details in Long Distance Pipeline Design
ZHANG Shuzhong, ZHAO Zhentang, , ,
2009, 28(7): 66-68. DOI: 10.6047/j.issn.1000-8241.2009.07.020
Abstract FullText HTML PDF
Pre-maintenance of New Valve before Operating
LIU Rungang, YANG Haijun
2009, 28(7): 69-72, 78. DOI: 10.6047/j.issn.1000-8241.2009.07.021
Abstract FullText HTML PDF
Field Running Experiment of Zhongyuan Oilfiled-Luoyang Petrochemical Plant Pipeline in Winter
LI Jing
2009, 28(7): 73-75. DOI: 10.6047/j.issn.1000-8241.2009.07.022
Abstract FullText HTML PDF
Improved Film Once-forming Process for Internal & External Fusion Bonded Epoxy Powder on Steel Pipes
QIAO Junping
2009, 28(7): 76-78. DOI: 10.6047/j.issn.1000-8241.2009.07.023
Abstract FullText HTML PDF