column
A Survey of Spiral-welded Steel Pipe Fabrication at Home and Abroad
Gao Junkai
1994, 13(4): 1-5.
Abstract FullText HTML PDF
Develop China's Pipeline Industry in an All-Round Way
Pan Jiahua
1994, 13(4): 6-10.
Abstract FullText HTML PDF
Prospects for China's Southwest Products Pipeline
Chen Guobin
1994, 13(4): 11-12.
Abstract FullText HTML PDF
Comparative Analysis on Vacuum—Operated and Pressure—Operated Oil Unloadings
Wang Meina
1994, 13(4): 13-15, 56.
Abstract FullText HTML PDF
Technical Requirements for Fuelling Station Construction
Qu Dongmei
1994, 13(4): 16-18.
Abstract FullText HTML PDF
Impact of Tank Roof on Shell Stress
Chen Xiangqiu
1994, 13(4): 19-22.
Abstract FullText HTML PDF
Inspection and Maintenance of Above-Ground Storage Tank——Introduction on API
Li Jinning
1994, 13(4): 23-24.
Abstract FullText HTML PDF
General Program for Inventory Calculation of Horizental Tank
Wan Haishun
1994, 13(4): 25-26.
Abstract FullText HTML PDF
Quality Control in the Process of Coating Steel Pipe with Epoxy
Xu Chuanxin, Zhao Xiaohua
1994, 13(4): 27-31, 63.
Abstract FullText HTML PDF
The relations between Pitting Corrosion and Cathodic Protection in Cang——Lin Pipeline
Bu Wenping, Wang Jun, Wang Naihe
1994, 13(4): 32-34.
Abstract FullText HTML PDF
Study and Application of Corrosion and Prevention Strip Map of Soil Conditions along Buried Pipeline
He Wuzhong, Li Shaozhong, Lu Yuanlu
1994, 13(4): 35-37.
Abstract FullText HTML PDF
Electrical Measurement of Microwave Current and Its Calculation
Fu Shimin, Fang Weilong, Shi Jieming
1994, 13(4): 38-42.
Abstract FullText HTML PDF
Alteration of AXT1-2× 250 Type Self-Propelled, Crawler-Mounted Two-Arc Welder
Yang Zhengdong
1994, 13(4): 43-47.
Abstract FullText HTML PDF
Application and Dissemination of Double—Vortex Seal in Pipeline Pump
Duan Xiaoyan, Tian Shuchen
1994, 13(4): 48-49.
Abstract FullText HTML PDF
A Discussion on the Alteration of a 100,00m3 External Floating Roof Tank to Internal Floating Roof Tank
Wang Jinsheng, Dong Lusheng, Zhang Shumin
1994, 13(4): 50-52.
Abstract FullText HTML PDF
Practical Economic Analysis on Fibreglass Reinforced Pipe
Chen Shushen
1994, 13(4): 53-56.
Abstract FullText HTML PDF
Boiling Over of Oil Storage Tank and Points for Attention in Fire Fighting
He Limin, He Yuesheng, Guo Guangchen
1994, 13(4): 57-59.
Abstract FullText HTML PDF
Measurement and Discussion of the Static Electricity in Oil Pump
Chen Maoqing
1994, 13(4): 60-61.
Abstract FullText HTML PDF
A Survey of Worldwide Pipeline Construction in 1993 and Future Forecast
Luo Fuxu
1994, 13(4): 62-63.
Abstract FullText HTML PDF