column
A thought over the pipeline risk assessment methods based on Big Data
FENG Qingshan
2014, 33(5): 457-461. DOI: 10.6047/j.issn.1000-8241.2014.05.001
Abstract PDF
Summary and cognition on safe operation for Mohe-Daqing Crude Oil Pipeline
CHEN Pengchao
2014, 33(5): 462-468. DOI: 10.6047/j.issn.1000-8241.2014.05.002
Abstract PDF
Status and implications of LNG industry regulation standards
YANG Jing, BIAN Wenjuan, WANG Chuqi, CEN Kang
2014, 33(5): 469-473. DOI: 10.6047/j.issn.1000-8241.2014.05.003
Abstract PDF
Characteristics and experience enlightenment of Sino-Russia Crude Oil Pipeline project
WANG Baoqun, LIN Yanhong, JIAO Zhongliang
2014, 33(5): 474-477. DOI: 10.6047/j.issn.1000-8241.2014.05.004
Abstract PDF
Thaw settlement prevention and temperature monitor of Mohe-Daqing Crude Oil Pipeline in permafrost marsh zone
FENG Shaoguang, ZHANG Xin, MA Tao, LI Rongguang, CAI Yongjun, CHEN Pengchao, MA Yunbin
2014, 33(5): 478-483, 492. DOI: 10.6047/j.issn.1000-8241.2014.05.005
Abstract PDF
Causes and counter-measures for exposed pipeline in frigid zone
CAI Yong-jun, WANG Kaimeng, ZHANG Shibin, ZHAO Yingbo, MA Yunbin, ZHANG Xiuhe, CHEN Pengchao, ZHAO Haifeng
2014, 33(5): 484-487. DOI: 10.6047/j.issn.1000-8241.2014.05.006
Abstract PDF
Monitoring of frost heaving and thaw settlement of Mohe-Daqing Crude Oil Pipeline
ZHANG Shibin, WANG Xueli, SHA Shengyi, ZHANG Aiguo, WU Guansheng, MA Yunbin, WANG Qi
2014, 33(5): 488-492. DOI: 10.6047/j.issn.1000-8241.2014.05.007
Abstract PDF
A type of anti-freezing Cu/CuSO4 reference electrode applied to frozen soil region
XU Chengwei, LIU Xiaopeng, JIANG Youwen, LIU Lingli, CHEN Hongyuan, XUE Zhiyuan, ZHAO Ying
2014, 33(5): 493-496. DOI: 10.6047/j.issn.1000-8241.2014.05.008
Abstract PDF
The method to interlock the outlet/inlet valves in pump stations of Mohe-Daqing Crude Oil Pipeline
WU Zhenning, ZHAO Meng, LI Yunchao, TANG Yan, PENG Yuan
2014, 33(5): 497-500. DOI: 10.6047/j.issn.1000-8241.2014.05.009
Abstract PDF
Reasons and solutions of SCADA communication interruption in Mohe-Daqing Crude Oil Pipeline
HE Zhaoyang, SHANG Yi, HE Liping, LI Chun, YIN Suna
2014, 33(5): 501-504. DOI: 10.6047/j.issn.1000-8241.2014.05.010
Abstract PDF
Reliability-centered maintenance of compressor station equipments driven by gas-turbine
ZHOU Dengji, GAO Shunhua, HOU Dali, ZHANG Huisheng
2014, 33(5): 505-509. DOI: 10.6047/j.issn.1000-8241.2014.05.011
Abstract PDF
Calculation of failure probability of the third-party interference for high pressure gas pipeline
JIN Shubin, ZHENG Honglong, HOU Lei, LIU Jia, WEI Wei, YANG Yufeng
2014, 33(5): 510-514. DOI: 10.6047/j.issn.1000-8241.2014.05.012
Abstract PDF
Leakage loss assessment of VOCs in oil refining equipment based on LDAR technology
DING Dewu, GAO Shaohua, ZHU Liang, LI Zhiping, ZHU Shengjie, ZOU Bing
2014, 33(5): 515-518. DOI: 10.6047/j.issn.1000-8241.2014.05.013
Abstract PDF
Research and application of water-based wax remover and inhibitor YE-60
HUANG Xiaodong
2014, 33(5): 519-521, 530. DOI: 10.6047/j.issn.1000-8241.2014.05.014
Abstract PDF
Pigging cycle for Yulin-Jinan Gas Pipeline
XIE Ying, CUI Mengmeng, QUAN Kai, YUAN Zongming, HE San
2014, 33(5): 522-525. DOI: 10.6047/j.issn.1000-8241.2014.05.015
Abstract PDF
Electrostatic hazard identification and prevention measures at tankfarm
CHEN Guohua, FAN Xiaomeng, JIANG Zhanghe
2014, 33(5): 526-530. DOI: 10.6047/j.issn.1000-8241.2014.05.016
Abstract PDF
Rheological properties of coarse oil-water emulsions
WU Qilin, ZHANG Jian, XU Jingyu
2014, 33(5): 531-537. DOI: 10.6047/j.issn.1000-8241.2014.05.017
Abstract PDF
Efficiency evaluation method for hydrotechnical prevention project of long-distance oil & gas pipeline
WU Zhongliang
2014, 33(5): 538-541. DOI: 10.6047/j.issn.1000-8241.2014.05.018
Abstract PDF
Hydraulic characteristics of the blow-down system of gas trunk lines
LOU Chen, GONG Jing, LIN Qi, LIN Jinxian, PENG Qinghua
2014, 33(5): 542-548. DOI: 10.6047/j.issn.1000-8241.2014.05.019
Abstract PDF
Virtual pipeline control for energy-saving in pipeline enterprises
CAO Xing, HAN Zhongchen, DONG Shaohua, YANG Yi
2014, 33(5): 549-552. DOI: 10.6047/j.issn.1000-8241.2014.05.020
Abstract PDF
Application status and improved method of 5S management in pipeline construction
YANG Xiaotong, CUI Jianjie, ZHANG Yongqi
2014, 33(5): 553-555. DOI: 10.6047/j.issn.1000-8241.2014.05.021
Abstract PDF
Pipe laying with elastic bending and pipe floating pulling method in a pipeline directional drilling construction in 3 300 m crossing the Yangtze River
WU Yiquan, MAO Naibing, WANG Yiming
2014, 33(5): 556-558. DOI: 10.6047/j.issn.1000-8241.2014.05.022
Abstract PDF
Stability analysis and construction optimization of loess inclined shaft in complex terrain
JIA Li, WANG Xiaolin, CHEN Ziyi
2014, 33(5): 559-562. DOI: 10.6047/j.issn.1000-8241.2014.05.023
Abstract PDF
Application of moderate principle to avoid vehicle CNG cylinder accident
TAN Jingyi, NIU Kaiyuan, HUANG Jiashun, LIU Miao, HUANG Weixing
2014, 33(5): 563-566. DOI: 10.6047/j.issn.1000-8241.2014.05.024
Abstract PDF
Alternating hot and cold oil transport program of Urumchi-Shanshan Oil Pipeline in winter
SUN Fafeng, YU Tao, FAN Huaping, WU Haichen, SHANG Yi, WANG Zhongliang
2014, 33(5): 567-570. DOI: 10.6047/j.issn.1000-8241.2014.05.025
Abstract PDF