column
Integrity Management System of Oil & Gas Pipelines
Dong Shaohua, Wang Lianwei, Fei Fan, ,
2010, 29(9): 641-647. DOI: 10.6047/j.issn.1000-8241.2010.09.001
Abstract FullText HTML PDF
Risk Assessment Technique and Control Measures of Salt Cavern Underground Gas Storage
Li Lifeng, Luo Jinheng, Zhao Xinwei, ,
2010, 29(9): 648-651. DOI: 10.6047/j.issn.1000-8241.2010.09.002
Abstract FullText HTML PDF
GeneraI Sltuation of Salt Cavern Gas Storage Worldwide
Zhang Yali, Zhao Yanjie
2010, 29(9): 652-655. DOI: 10.6047/j.issn.1000-8241.2010.09.003
Abstract FullText HTML PDF
Application of Satellite Monitoring Technology in Preventing the Third Party Damage in Pipelines
Nan Lituan, Chen Liqiong, Duan Yonghong,
2010, 29(9): 656-659. DOI: 10.6047/j.issn.1000-8241.2010.09.004
Abstract FullText HTML PDF
Crack Evaluation Method of Oil&Gas Pipeline
Liu Yue, Meng Hexue
2010, 29(9): 660-663. DOI: 10.6047/j.issn.1000-8241.2010.09.005
Abstract FullText HTML PDF
Influence of Demulsifier on the Rheology of Water-content Heavy Crude Oil
Xu Cheng, Huang Qiyu, Huang Xiaojuan, ,
2010, 29(9): 664-664, 672. DOI: 10.6047/j.issn.1000-8241.2010.09.006
Abstract FullText HTML PDF
Numerical Simulation on Moisture-Heat Coupling of the Soll Around Hot oil Pipeline in Permafrost Region
Du Mingjun, Ma Guiyang, Li Jihong,
2010, 29(9): 665-668. DOI: 10.6047/j.issn.1000-8241.2010.09.007
Abstract FullText HTML PDF
influence of Temperature Parameter on Technology Design of Gas Transmission Pipeline
Jiang Guoye, Wu Xiance
2010, 29(9): 669-672. DOI: 10.6047/j.issn.1000-8241.2010.09.008
Abstract FullText HTML PDF
Damp Heat Aging Performance of Hot-melt Adhesive for Heat Shrinkable Sleeve
She Shuping, Zhao Jishi, Hou Yu, , , , ,
2010, 29(9): 673-676. DOI: 10.6047/j.issn.1000-8241.2010.09.009
Abstract FullText HTML PDF
Special Corrosion Control Technique for Intemal Pipe Wall and Pipe Ends of Submarine Pipeline with Concrete Blocks
Yan Milin, Mei Qi, Feng Yaorong, , ,
2010, 29(9): 677-678. DOI: 10.6047/j.issn.1000-8241.2010.09.010
Abstract FullText HTML PDF
Corrosion Rate Prediction of Tank Based on Modified Grey System Theory Model
Zhu Benting, Wu Ming, Chen Jun
2010, 29(9): 679-682. DOI: 10.6047/j.issn.1000-8241.2010.09.011
Abstract FullText HTML PDF
Study Progress in Viscoslty-Tempereture Mathematical Model of Mixed Crude Oil
Zheng Yunping, Li Xun, Wang Yuchun, ,
2010, 29(9): 683-686. DOI: 10.6047/j.issn.1000-8241.2010.09.012
Abstract FullText HTML PDF
Cause Analysis oil Pressure Drawdown in GangZao Products Pipeline after Shutting Down
Guo Yi, Xu Yulei, Liu Jia,
2010, 29(9): 687-688. DOI: 10.6047/j.issn.1000-8241.2010.09.013
Abstract FullText HTML PDF
Several Influence Factors of Operation Economyfor Hot Oil Pipeline
Meng Zhenhu, Liu Dan
2010, 29(9): 689-695. DOI: 10.6047/j.issn.1000-8241.2010.09.014
Abstract FullText HTML PDF
Application of Complex Liquid Sealing Technique in Hydraulic Relief Valve
Luo Lailong, Luo Xuejun, Liu Kunpeng, ,
2010, 29(9): 696-697,700. DOI: 10.6047/j.issn.1000-8241.2010.09.015
Abstract FullText HTML PDF
Design of Velocity-controllable Pig for Natural Gas Pipeline
Geng Dai, Zhang Shimin, Liu Heng,
2010, 29(9): 698-700. DOI: 10.6047/j.issn.1000-8241.2010.09.016
Abstract FullText HTML PDF
Implementation of Energy Saving Coating Material in Heaters for Oil Pipeline
Yang Jingli, Liu Guohao, Xu Tie, , , , ,
2010, 29(9): 701-702. DOI: 10.6047/j.issn.1000-8241.2010.09.017
Abstract FullText HTML PDF
Inspection and Evaluation on the Cathodic Protection System In Renqiu Initial Pump Station
Wu Changfang, He Chongwei, Li Rongguang, , , , , ,
2010, 29(9): 703-704. DOI: 10.6047/j.issn.1000-8241.2010.09.018
Abstract FullText HTML PDF
Discussion on Fracture Cause of Karamay-Ururnqi Oil Products Parallel Pipeline During Pressure Test
Liu Zhizeng, Zheng Zhaodong, Wang Yu
2010, 29(9): 705-707. DOI: 10.6047/j.issn.1000-8241.2010.09.019
Abstract FullText HTML PDF
Gas Transmission Loss ControI of Long-distance Gas Pipeline
Li Kai, Niu Shuwei, Liu Zhihua
2010, 29(9): 708-710. DOI: 10.6047/j.issn.1000-8241.2010.09.020
Abstract FullText HTML PDF
Effect of the Thermometer Accuracy on Energy Consumption of Hot Oil Pipeline
Liu Hongliang
2010, 29(9): 711-712,715. DOI: 10.6047/j.issn.1000-8241.2010.09.021
Abstract FullText HTML PDF
Differential In the Process Design Standards of Oil Pipeline between CTΓy153-39-167-2006 and GB 50253-2006
Zhang Wei, Meng Xianghai, Wang Min, ,
2010, 29(9): 713-715. DOI: 10.6047/j.issn.1000-8241.2010.09.022
Abstract FullText HTML PDF
Temperature Control to Extend Storage Period of Products
Zhang Yunhua, Yin Menglian, Wang Shuai
2010, 29(9): 716-719. DOI: 10.6047/j.issn.1000-8241.2010.09.023
Abstract FullText HTML PDF