column
Relationships on Development of Pipeline Industry and Progress of Metallurgical Technology
Pan Jiahua
1999, 18(5): 1-3.
Abstract FullText HTML PDF
Practice on Expanding the Throughput Rate of Huoshaoshan——Beisantai Oil Pipeline
Min Xihua, Zhang Zhaoqin, , ,
1999, 18(5): 4-5.
Abstract FullText HTML PDF
Calculation on Winter Storage Time of Diesel Oil without Heating
Shang Peng
1999, 18(5): 6-8.
Abstract FullText HTML PDF
Analysis on the Failures of Floating Roof and Supporting Legs in a 20 000 m3 Tank
Zhao Donghai, Wang Guoqing
1999, 18(5): 8-11.
Abstract FullText HTML PDF
On Classification and Selection for the Structures of Crossover Pipeline
Dai Jiaqi
1999, 18(5): 12-14.
Abstract FullText HTML PDF
The Application of Fuzzy Pattern Recognization on Judging Flow Regimes
Wang Xiaodong, Li Zhenlin,
1999, 18(5): 15-18.
Abstract FullText HTML PDF
The Anti-earthquake Length for the Joint Revolution Bellows of Oil Tank and Pipeline
Zhang Jinguo, Lv Yingmin, , ,
1999, 18(5): 19-21, 48.
Abstract FullText HTML PDF
The Application of Pressure Release Valve in Korla--Shanshan Oil Pipeline
Xue Ling
1999, 18(5): 22-25.
Abstract FullText HTML PDF
The Operation Analysis of Surge Relief Valve in Korla—Shanshan Oil Pipeline
Cai Lijun, Gao Qi
1999, 18(5): 26-28.
Abstract FullText HTML PDF
Automatic Fault Diagnosis System in Centrifugal Pump
Yang Yonghe, Ying Guoyao, , ,
1999, 18(5): 29-31.
Abstract FullText HTML PDF
The Application of S5-95U PLC in Heat Medium Heater Control System
Yin Zhengxing, Zhi Jiyang
1999, 18(5): 32-34.
Abstract FullText HTML PDF
Analysis on the Surge Cause of Pipeline
Zhao Jingqi
1999, 18(5): 35-41.
Abstract FullText HTML PDF
Technical Reform for the Terminal Metering Station of Taqing Oilfield
Wang Xiaolu, Ma Tielun, ,
1999, 18(5): 42-44.
Abstract FullText HTML PDF
How to Select Automatic Metering Device of Oil Tank
Sun Guofeng
1999, 18(5): 45-46.
Abstract FullText HTML PDF
The Metering Device of Two-phase Separation Variable Pressure Controlling in Producting Well
Guo Changhui
1999, 18(5): 47-48.
Abstract FullText HTML PDF
The Optimal Design of Pigging Technology for the Associated Gas Gathering Line of Oilfield
Ren Jia, Qian Hao
1999, 18(5): 49-50.
Abstract FullText HTML PDF
Feasibility Analysis of Horizontal Direction Drill Passing through Nile
Zheng Chenghu
1999, 18(5): 50-51.
Abstract FullText HTML PDF
Necessity to Set up Bridge on the Accessory Equipments of Tank
Wang Guotao, Yuan Shemei
1999, 18(5): 52-53.
Abstract FullText HTML PDF
Countermeasures against the Effusive Eruption Fire of Oil Tank
Wang Shifang, Zhong Jiwen,
1999, 18(5): 53-55.
Abstract FullText HTML PDF
Technical Reform for Automatic Oil Loading Adjustment System of Tank Farm
Ma Te, Cheng Defa
1999, 18(5): 56-58.
Abstract FullText HTML PDF
The Failure Cause of Oil Tank and Its Countermeasures
Wang Fanxi, Li Li
1999, 18(5): 59-60.
Abstract FullText HTML PDF