column
Improvement on China's Design and Pressure-Testing Standards of Natural Gas Pipeline Engineering
LIANG Jinghua, LIANG Xizhang,
2009, 28(2): 1-4. DOI: 10.6047/j.issn.1000-8241.2009.02.001
Abstract FullText HTML PDF
Risk Assessment of a Petroleum Transportation Pipeline in Service
SHUAI Jian, DANG Wenyi,
2009, 28(2): 5-9. DOI: 10.6047/j.issn.1000-8241.2009.02.002
Abstract FullText HTML PDF
Blending Technique of Natural Gas and its Application
CAO Xiong, FENG Xiaodong, ,
2009, 28(2): 10-13, 70. DOI: 10.6047/j.issn.1000-8241.2009.02.003
Abstract FullText HTML PDF
Development of Oily Waste Treatment Technology in Foreign Countries
QIN Xiaoxia, LI Zili,
2009, 28(2): 14-16. DOI: 10.6047/j.issn.1000-8241.2009.02.004
Abstract FullText HTML PDF
Gas Storage in Porous Materials
SUN Yan, ZHOU Li
2009, 28(2): 16-19. DOI: 10.6047/j.issn.1000-8241.2009.02.005
Abstract FullText HTML PDF
Application of Fuzzy Risk Assessment Based on Neural Network in Urban Buried Gas Pipeline
WEI Bixia, YANG Xiaoxiang, ,
2009, 28(2): 20-23. DOI: 10.6047/j.issn.1000-8241.2009.02.006
Abstract FullText HTML PDF
Determination and Optimization for Operation Scheme of Intermediate Station in Gas Pipeline
XIE Xuemei, DU Jianhe,
2009, 28(2): 23-25. DOI: 10.6047/j.issn.1000-8241.2009.02.007
Abstract FullText HTML PDF
Study on the Transient Flow Control of Long-distance Oil Pipeline
FANG Xupeng, XIONG Wei,
2009, 28(2): 26-30. DOI: 10.6047/j.issn.1000-8241.2009.02.008
Abstract FullText HTML PDF
Calculating Temperature Field of Light-oil inside Rail Tanker with Finite Element Method
SHI Wen, WU Ming, ,
2009, 28(2): 31-33. DOI: 10.6047/j.issn.1000-8241.2009.02.009
Abstract FullText HTML PDF
Theoretical Study on the Duration of Hydrostatic Test of Pipeline
WANG Hongju, TIAN Li, , ,
2009, 28(2): 33-36. DOI: 10.6047/j.issn.1000-8241.2009.02.010
Abstract FullText HTML PDF
Combination-based Algorithm for Steady Analysis of Natural Gas Pipeline Network
BAI Jianhui, WANG Yuchun, ,
2009, 28(2): 37-39. DOI: 10.6047/j.issn.1000-8241.2009.02.011
Abstract FullText HTML PDF
Calculation and Annalysis on Contaminated Volume of Southwestern Products Oil Pipeline
DAI Fujun, HU Xuan,
2009, 28(2): 40-42+3. DOI: 10.6047/j.issn.1000-8241.2009.02.012
Abstract FullText HTML PDF
Viscosity Reduction Test of Viscosity Reducer-doped Water-soluble Emulsion
SUN Qiang, SHEN Longshe
2009, 28(2): 43-46. DOI: 10.6047/j.issn.1000-8241.2009.02.013
Abstract FullText HTML PDF
Steady Calculation Model of Gas-liquid Two-phase Flow Based on Two-fluid Model of Pipe
QI Jianbo, LUO Lihua, ,
2009, 28(2): 46-49. DOI: 10.6047/j.issn.1000-8241.2009.02.014
Abstract FullText HTML PDF
Choosing Proper Excess Air Coefficient for Direct Fired Heater
ZHANG Liangjun, CHEN Meng
2009, 28(2): 50-51. DOI: 10.6047/j.issn.1000-8241.2009.02.015
Abstract FullText HTML PDF
Recovery and Utilization of Pressure Energy from High-pressure Gas Pipelines and Economic Analysis
CHEN Shaokai, LI Zili, ,
2009, 28(2): 51-54. DOI: 10.6047/j.issn.1000-8241.2009.02.016
Abstract FullText HTML PDF
Technical Analysis on Coal-bed Gas Transportation Technology of Pressure Pipeline
BI Yanjun, SHAO Yunqiao,
2009, 28(2): 54-56. DOI: 10.6047/j.issn.1000-8241.2009.02.017
Abstract FullText HTML PDF
Field Application of HG Drag Reduction Agent in Hejian-Shijiazhuang Oil Pipeline
YU Xiaomin, CAO Danfu, ,
2009, 28(2): 57-59. DOI: 10.6047/j.issn.1000-8241.2009.02.018
Abstract FullText HTML PDF
Improvement on Incoming Technological Process of Pump Station and Suggestions
LIU Hong
2009, 28(2): 60-61. DOI: 10.6047/j.issn.1000-8241.2009.02.019
Abstract FullText HTML PDF
Design on Anti-Surge Control System of Centrifugal Compressor at Multi-gas Resources
ZHAO Shangxin, WANG Junye
2009, 28(2): 62-64. DOI: 10.6047/j.issn.1000-8241.2009.02.020
Abstract FullText HTML PDF
Field Stress and Strain Testing on Damaged Pipe Segment in LuNing Oil Pipeline
GAO Andong, YANG Zhanpin, , , , , , ,
2009, 28(2): 64-67. DOI: 10.6047/j.issn.1000-8241.2009.02.021
Abstract FullText HTML PDF
Applying Carbon Fiber Composite System to Repair Corroded Pipe
FU Mingfu, LIANG Hong, ,
2009, 28(2): 68-70. DOI: 10.6047/j.issn.1000-8241.2009.02.022
Abstract FullText HTML PDF
Calibration on Coriolis Mass Flowmeter (CMS) in Lanzhou-Chengdu-Chongqing Products Oil Pipeline
ZHAO Rongsheng, ZHAO Qing
2009, 28(2): 71-73. DOI: 10.6047/j.issn.1000-8241.2009.02.023
Abstract FullText HTML PDF
Calculation on the Repeatability of Standard Pipe Prover
FAN Zongkui
2009, 28(2): 74-76. DOI: 10.6047/j.issn.1000-8241.2009.02.024
Abstract FullText HTML PDF
Design of Automatic Valve and Water Hammer Analysis
ZHANG Shifu, ZHU Jinpeng, ,
2009, 28(2): 76-79. DOI: 10.6047/j.issn.1000-8241.2009.02.025
Abstract FullText HTML PDF