column
Research on Process Control Technology to the End Section of West Products Pipeline
ZHANG Qiang, GONG Jing
2008, 27(1): 1-4. DOI: 10.6047/j.issn.1000-8241.2008.01.001
Abstract FullText HTML PDF
The Influence of Elevation on the Commissioning of China West Products Pipeline
ZHANG Nan, GONG Jing, , , ,
2008, 27(1): 5-8. DOI: 10.6047/j.issn.1000-8241.2008.01.002
Abstract FullText HTML PDF
Waxy Crude Oil Transporting Technology of Huangdao-Qingdao Pipeline
LI Guan, WANG Yanfen
2008, 27(1): 9-10, 20. DOI: 10.6047/j.issn.1000-8241.2008.01.003
Abstract FullText HTML PDF
Study on the Gas Diffusing Rule for the "Gas-to-Gas Process" of Gas Transmission Pipeline during Commissioning
XU Yulei, SONG Xiaoqin, , ,
2008, 27(1): 11-13. DOI: 10.6047/j.issn.1000-8241.2008.01.004
Abstract FullText HTML PDF
Numerical Study on the Soil Temperature Field after Shutdown of Hot Oil Pipeline
ZHAO Huijun, ZHANG Qingsong, ,
2008, 27(1): 14-17. DOI: 10.6047/j.issn.1000-8241.2008.01.005
Abstract FullText HTML PDF
The Fitting of HL Curves of Dukler Ⅱ on a New Hybrid Genetic Algorithm
SUN Hai, LI Zili,
2008, 27(1): 17-20. DOI: 10.6047/j.issn.1000-8241.2008.01.006
Abstract FullText HTML PDF
Non-linear Analysis for the Characteristics of Thawing Cylinders around the Buried Heat Oil Pipeline in Permafrost Regions
HE Shusheng, JIN Huijun, ,
2008, 27(1): 21-25. DOI: 10.6047/j.issn.1000-8241.2008.01.007
Abstract FullText HTML PDF
Improvement on the Layout of Pipeline Block Valve for Gas Transmission Pipeline
SHI Hang, LIANG Qiang
2008, 27(1): 26-27. DOI: 10.6047/j.issn.1000-8241.2008.01.008
Abstract FullText HTML PDF
Comparison and Technology Analysis to Wax Scrapers for the Large-scaled Floating Roof Oil Tank
WANG Sha
2008, 27(1): 28-31. DOI: 10.6047/j.issn.1000-8241.2008.01.009
Abstract FullText HTML PDF
Application and Analysis of Drag Reduction Agent Used in Longdong Oil Pipelines
CAO Dengju, HE Jianchuan, , ,
2008, 27(1): 32-35, 54. DOI: 10.6047/j.issn.1000-8241.2008.01.010
Abstract FullText HTML PDF
Conservative Analysis on the Remaining Strength Assessment of Corroded Pipeline for ASME B31G and API 579
HE Dongsheng, ZHANG Peng,
2008, 27(1): 36-40. DOI: 10.6047/j.issn.1000-8241.2008.01.011
Abstract FullText HTML PDF
The Application of Microcor Internal Corrosion Monitoring System in Shannxi-Beijing Gas Transmission Pipeline
LIU Gang, DONG Shaohua,
2008, 27(1): 41-43. DOI: 10.6047/j.issn.1000-8241.2008.01.012
Abstract FullText HTML PDF
Trenchless Pipe Repair Technology and Relative Suggestion
WANG Huan, WANG Rui,
2008, 27(1): 43-46+63+4. DOI: 10.6047/j.issn.1000-8241.2008.01.013
Abstract FullText HTML PDF
Comparison and Application to Gas Displacement Scenarios of Gas Transmission Pipelines
LIU Xuemei, XIE Ying, ,
2008, 27(1): 47-50. DOI: 10.6047/j.issn.1000-8241.2008.01.014
Abstract FullText HTML PDF
Calculation to Foam Volume of Floating Roof Oil Tank
WANG Zhenguo
2008, 27(1): 51-54. DOI: 10.6047/j.issn.1000-8241.2008.01.015
Abstract FullText HTML PDF
Cezi Waterway Horizontal Directional Drilling Practice for Aoshan-Zhenhai Import Oil Pipeline Construction Project
DENG Yan
2008, 27(1): 55-57. DOI: 10.6047/j.issn.1000-8241.2008.01.016
Abstract FullText HTML PDF
Application of Automatic Dewaterer of Oil Tank in Oil Dewatering Practice
PAN Wuhan
2008, 27(1): 58-59. DOI: 10.6047/j.issn.1000-8241.2008.01.017
Abstract FullText HTML PDF
Site Determination on Underground Water-sealing Oil Storage in Rock Caverns
PENG Zhenhua, LI Junyan, ,
2008, 27(1): 60-62. DOI: 10.6047/j.issn.1000-8241.2008.01.018
Abstract FullText HTML PDF