column
Construction and Safety Information of Main Pipelines in Russia
GUO Hailin, GONG Min, ,
2006, 25(4): 1-4. DOI: 10.6047/j.issn.1000-8241.2006.04.001
Abstract FullText HTML PDF
Construction and Development of Underground Water-sealed Mined Storage Caverns Abroad: A Review
DU Guomin, GENG Xiaomei,
2006, 25(4): 5-6. DOI: 10.6047/j.issn.1000-8241.2006.04.002
Abstract FullText HTML PDF
The Application of Gray Correlation Analysis in W. Kent Muhlbauer Risk Assessment of Oil and Gas Pipeline
TIAN Na, CHEN Bao-dong,
2006, 25(4): 7-10. DOI: 10.6047/j.issn.1000-8241.2006.04.003
Abstract FullText HTML PDF
Kelamayi-Dushanzi Oil Pipeline Transports Oil with Combinational Transportation Process
SUN Jiangang, XIE Ping, ,
2006, 25(4): 11-14. DOI: 10.6047/j.issn.1000-8241.2006.04.004
Abstract FullText HTML PDF
Numerical Simulation on the Stable State of Gas Pipeline
CAI Xinjing, ZHANG Fuyi
2006, 25(4): 15-18. DOI: 10.6047/j.issn.1000-8241.2006.04.005
Abstract FullText HTML PDF
Mathematical Model of Unstable Coupled Flow with Changed Physical Property in Hot Oil Pipeline
WANG Haiqin, ZHANG Guozhong
2006, 25(4): 19-22. DOI: 10.6047/j.issn.1000-8241.2006.04.006
Abstract FullText HTML PDF
Investigation on SCC in Gas Transmission Pipeline in China
SHUAI Jian
2006, 25(4): 22-26. DOI: 10.6047/j.issn.1000-8241.2006.04.007
Abstract FullText HTML PDF
Evaluation on the Corrosion Rate of Pipeline with Analytic Hierarchy Process and Fuzzy Comprehensive Evaluation Method
LI Pei, YANG Wei
2006, 25(4): 27-33. DOI: 10.6047/j.issn.1000-8241.2006.04.008
Abstract FullText HTML PDF
The Application of the Improved BP Neural Network in Prediction of Pipeline Corrosion Rate
LIU Gang, ZHOU Zhilong, , ,
2006, 25(4): 34-37, 58. DOI: 10.6047/j.issn.1000-8241.2006.04.009
Abstract FullText HTML PDF
The Method of Once-step Moulding Used in Manufacturing of Pipeline Coating
QIAO Junping, ZHANG Siji, ,
2006, 25(4): 38-40. DOI: 10.6047/j.issn.1000-8241.2006.04.010
Abstract FullText HTML PDF
Application of GIS Technology in Pre-Engineering Design of Long Distance Pipeline
LIU Junfeng, LONG Shihua
2006, 25(4): 41-42, 54. DOI: 10.6047/j.issn.1000-8241.2006.04.011
Abstract FullText HTML PDF
Energy Saving Technology Study on Incorporated Wind and/or Solar Power for Oil Gathering Pipeline
DING Yuehua, CHEN Yuguang,
2006, 25(4): 43-46. DOI: 10.6047/j.issn.1000-8241.2006.04.012
Abstract FullText HTML PDF
Discussion on the Safety Distance and Space of High-tension Transmission Line over Buried Pipelines
ZHANG Junyi, WANG Fucai,
2006, 25(4): 47-49. DOI: 10.6047/j.issn.1000-8241.2006.04.013
Abstract FullText HTML PDF
The Application and Calculation of Oil-Water Pressure Loss Model with High Water percentage in Horizontal Pipelines
KANG Wanli, LIU Guifan,
2006, 25(4): 50-54. DOI: 10.6047/j.issn.1000-8241.2006.04.014
Abstract FullText HTML PDF
Study on the Abnormal Fracture Rule of DWTT Test for High-grade Pipe Steel
XIE Lihua, JI Lingkang, ,
2006, 25(4): 55-58. DOI: 10.6047/j.issn.1000-8241.2006.04.015
Abstract FullText HTML PDF
Cleaning Technology for Oil Tank
LI Haiguang
2006, 25(4): 59-61. DOI: 10.6047/j.issn.1000-8241.2006.04.016
Abstract FullText HTML PDF