Removal Construction for a Crossover Products Pipeline Section
-
-
Abstract
A 2km-long crossover products pipeline section in Golmud-Lhasa Productsd Pipeline will be removed from No. 1 Bridge to No. 2 Bridge to meet the needs of local economic development. In the article, the pro-gram of pipeline section removal and new pipe section installation construction in winter and construction process are introduced.
-
-