YAO Zhixiang. Removal Construction for a Crossover Products Pipeline Section[J]. Oil & Gas Storage and Transportation, 2003, 22(3): 22-23.
Citation: YAO Zhixiang. Removal Construction for a Crossover Products Pipeline Section[J]. Oil & Gas Storage and Transportation, 2003, 22(3): 22-23.

Removal Construction for a Crossover Products Pipeline Section

  • A 2km-long crossover products pipeline section in Golmud-Lhasa Productsd Pipeline will be removed from No. 1 Bridge to No. 2 Bridge to meet the needs of local economic development. In the article, the pro-gram of pipeline section removal and new pipe section installation construction in winter and construction process are introduced.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return