Ceng Duoli. Failures and Trouble Shooting for Golmud——Lhasa Oil Product Pipeline[J]. Oil & Gas Storage and Transportation, 1999, 18(7): 56-57.
Citation: Ceng Duoli. Failures and Trouble Shooting for Golmud——Lhasa Oil Product Pipeline[J]. Oil & Gas Storage and Transportation, 1999, 18(7): 56-57.

Failures and Trouble Shooting for Golmud——Lhasa Oil Product Pipeline

  • An analysis shows that the major failure in Golmud——Lhasa oil product pipeline includescoating deterioration, poor CP, weld defects, and human destrution. Therefore, some suggestions are put forward, including scientific evaluation on the status quo of corrosion and CP system of the line, inspection on internal/external corrosion, wall thickness distribution, damage and/or deformation, and introducing foreign leakage detection system.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return