Wang Xiaolu, Ma Tielun, . Technical Reform for the Terminal Metering Station of Taqing Oilfield[J]. Oil & Gas Storage and Transportation, 1999, 18(5): 42-44.
Citation: Wang Xiaolu, Ma Tielun, . Technical Reform for the Terminal Metering Station of Taqing Oilfield[J]. Oil & Gas Storage and Transportation, 1999, 18(5): 42-44.

Technical Reform for the Terminal Metering Station of Taqing Oilfield

  • The principle of technical reform for the computer system in terminal metering station and its function are introduced. The reformed host computer configuration for the instrument package of oil metering system includes AW51B application/operating station processor, WP51B operating station processor, COMM10 communication processor, CP30FT fault tolerant processor, and FBP12 field bus processor. The data test and practice show that the reformed system is safe and reliable in operation, accurate in metering, convenient to maintain and operation as well as management.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return