Pan Jiahua. Analysis on the Breaking Reason of Suspended Point of Xuyi Huaihe River Pineline Bridge[J]. Oil & Gas Storage and Transportation, 1992, 11(4): 33-39.
Citation: Pan Jiahua. Analysis on the Breaking Reason of Suspended Point of Xuyi Huaihe River Pineline Bridge[J]. Oil & Gas Storage and Transportation, 1992, 11(4): 33-39.

Analysis on the Breaking Reason of Suspended Point of Xuyi Huaihe River Pineline Bridge

More Information
  • Received Date: February 27, 1992
  • Available Online: August 23, 2023
  • The Xuyi Huaihe River Bridge is a bridge combined with pipeline and road in Lu-Ning Oil Pipeline. The breaking events of pipe-suspended point had been happened in the early date of pipeline completement. This article analyses various factors and concludes the following breaking reasons: 1. not enough consideration of the whole system so that the less load had been evaluated; 2. higher permissible stress had been sellected; 3. the structure was not so reasonable.

Catalog

    Article views PDF downloads Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return