Tian Guang-lue, Zhou Liang-chen. An Analysis of the Faults and Engineering Geological Conditions in Respect to the Large Tank Farm of Tieling Pump Station[J]. Oil & Gas Storage and Transportation, 1986, 5(2): 39-42.
Citation: Tian Guang-lue, Zhou Liang-chen. An Analysis of the Faults and Engineering Geological Conditions in Respect to the Large Tank Farm of Tieling Pump Station[J]. Oil & Gas Storage and Transportation, 1986, 5(2): 39-42.

An Analysis of the Faults and Engineering Geological Conditions in Respect to the Large Tank Farm of Tieling Pump Station

  • In order to solve the engineering problems as to building up two 50, 000m3 floating vault tanks in Tieling Pump station where geological faults formation was discovered, the author of the article have made geological investigation comprehensively and consulted a great deal of data and information. They end it with the conclusion that'no sign of latest movement of the faults in tank area, and it is not impossible to build tanks of great bulk there.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return