The Construction Engineering of Second-Deep Well Anode Grounding Beds
-
Graphical Abstract
-
Abstract
Deep well anode grounding beds are often prefered because of their effectiveness if there is shielding, disturances or a case in which regional pretection is considered necessary for buried pipe network. But its application is limited by complex engineering and expensive in construction.Here is Presented a simple, effective favricating way of construction, by which it is only 80% more expensive in cost than shallow buried graphite anode grounding bed to build up a 20m deep similar one.
-
-