Zhan Shengwen, Feng Yijun, Wu Xingzhong, . Feasibility analysis on the overhead crossing in one pipe-bridge for Sino-Myanmar Oil/Gas Pipelines[J]. Oil & Gas Storage and Transportation, 2011, 30(11): 827-829. DOI: CNKI:13-1093/TE.20110913.1826.014
Citation: Zhan Shengwen, Feng Yijun, Wu Xingzhong, . Feasibility analysis on the overhead crossing in one pipe-bridge for Sino-Myanmar Oil/Gas Pipelines[J]. Oil & Gas Storage and Transportation, 2011, 30(11): 827-829. DOI: CNKI:13-1093/TE.20110913.1826.014

Feasibility analysis on the overhead crossing in one pipe-bridge for Sino-Myanmar Oil/Gas Pipelines

  • Sino-Myanmar Oil/Gas Pipelines designed are parallelly laid. The pipelines will pass through many V-shaped valleys in Nujiang River, Lancangjiang River, etc., and it is necessary to adopt the overhead crossing method in the pipelines'construction. Based on the parallel laying design principle, the paper discusses the feasibility in sharing the overhead crossing facilities for the two pipelines. The requirement adopted in foreign pipeline projects for overhead crossing with one pipe-bridge is introduced, and the case study is also given. From the viewpoint of design and operation, the issues are analyzed and compared in safety, economy, environment protection and risk probability for the two pipelines in the sharing and one pipeline with the pipe-bridge. Furthermore, the design scenario for the two pipelines'sharing is proposed. The design in the pipe-bridge foundation, tower, cable, stress analysis, pipe material, corrosion control, valve chamber, lightning protection and forewarning system are presented in detail.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return