LI Yansong, HAN Dong, DING Dingqian, LYU Huijian, LIANG Yongtu. Simulation on the whole water commissioning process of hilly products pipelines[J]. Oil & Gas Storage and Transportation, 2018, 37(12): 1368-1375. DOI: 10.6047/j.issn.1000-8241.2018.12.008
Citation: LI Yansong, HAN Dong, DING Dingqian, LYU Huijian, LIANG Yongtu. Simulation on the whole water commissioning process of hilly products pipelines[J]. Oil & Gas Storage and Transportation, 2018, 37(12): 1368-1375. DOI: 10.6047/j.issn.1000-8241.2018.12.008

Simulation on the whole water commissioning process of hilly products pipelines

More Information
  • Received Date: May 20, 2017
  • Revised Date: November 03, 2018
  • Available Online: August 20, 2023
  • Published Date: November 21, 2017
  • Commissioning is the key link for the safe operation of products pipelines, so it is necessary to prepare a reliable commissioning scheme in advance. At present, however, most of the commissioning schemes are prepared on the basis of practical experience and they cannot precisely predict the hydraulic condition of each point along the pipeline during the commissioning. In order to ensure the safety of hilly products pipelines during the commissioning, mathematical models were established corresponding to three stages of water commissioning. Then, by virtue of these models, the hydraulic parameters along the whole hilly products pipeline in the process of commissioning were calculated, and the distribution locations and lengths of the slack flow sections along the whole pipeline during the water-filling and pigging were predicted. Moreover, the pump plan for each stage of commissioning was provided and the volume of oil-water mixture and the location of oil-water interface during oil-water replacement were monitored. The research results can provide reference for the preparation of commissioning scheme of hilly products pipelines.
  • [1]
    于达, 谢萍, 黄忠胜, 等. 对我国成品油管道建设的几点思考[J]. 油气储运, 2014, 33(1): 1-4. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201401002.htm

    YU D, XIE P, HUANG Z S, et al. Several considerations on products pipeline construction in China[J]. Oil & Gas Storage and Transportation, 2014, 33(1): 1-4. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201401002.htm
    [2]
    祝悫智, 吴超, 李秋扬, 等. 全球油气管道发展现状及未来趋势[J]. 油气储运, 2017, 36(2): 1-7. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201704003.htm

    ZHU Q Z, WU C, LI Q Y, et al. Development status and trend of global oil and gas pipelines[J]. Oil & Gas Storage and Transportation, 2017, 36(2): 1-7. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201704003.htm
    [3]
    梁博一. 输油管道投产过程水力特征研究[D]. 北京: 中国石油大学(北京), 2011: 1-3.

    LIANG B Y. Study on the hydraulic characteristics of oil pipelines in commissioning[D]. Beijing: China University of Petroleum(Beijing), 2011: 1-3.
    [4]
    张欣雨, 谢静, 宇波. 起伏管道空管投油气液两相流动的数值模拟[J]. 中国科学院大学学报, 2017, 34(2): 265-272. https://www.cnki.com.cn/Article/CJFDTOTAL-ZKYB201702023.htm

    ZHANG X Y, XIE J, YU B. Numerical simulation on the gas-liquid two-phase flow in the direct commissioning process of a hilly pipeline[J]. Journal of University of Chinese Academy of Sciences, 2017, 34(2): 265-272. https://www.cnki.com.cn/Article/CJFDTOTAL-ZKYB201702023.htm
    [5]
    王祺来, 张欣雨, 张康鑫, 等. 起伏管段气液两相流数值模拟[J]. 北京石油化工学院学报, 2018, 26(3): 26-31, 58. doi: 10.12053/j.issn.1008-2565.2018.03.005

    WANG Q L, ZHANG X Y, ZHANG K X, et al. Gas-liquid two-phase flow numerical simulation of undulating pipeline[J]. Journal of Beijing Institute of Petrochemical Technology, 2018, 26(3): 26-31, 58. doi: 10.12053/j.issn.1008-2565.2018.03.005
    [6]
    王文彦. 成品油管道试运投产流程[J]. 油气储运, 2013, 32(11): 1254-1256. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201311026.htm

    WANG W Y. Commissioning trial procedures of product oil pipeline[J]. Oil & Gas Storage and Transportation, 2013, 32(11): 1254-1256. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201311026.htm
    [7]
    高宏扬, 王鹏, 张昊, 等. 兰郑长成品油管道投产运行问题[J]. 油气储运, 2010, 29(12): 952-953. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201012027.htm

    GAO H Y, WANG P, ZHANG H, et al. Problems of commissioning and operation for Lanzhou-Zhengzhou-Changsha Products Pipeline[J]. Oil & Gas Storage and Transportation, 2010, 29(12): 952-953. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201012027.htm
    [8]
    刘静, 徐燕萍, 李岩松, 等. 贵渝成品油管道充水扫线问题分析及处理[J]. 辽宁石油化工大学学报, 2016, 36(6): 24-28. https://www.cnki.com.cn/Article/CJFDTOTAL-FSSX201606006.htm

    LIU J, XU Y P, LI Y S, et al. Study on water-filling and pigging process of Guiyang-Chongqing products pipeline[J]. Journal of Liaoning Shihua University, 2016, 36(6): 24-28. https://www.cnki.com.cn/Article/CJFDTOTAL-FSSX201606006.htm
    [9]
    于涛, 顾建栋, 刘丽君, 等. 石兰原油管道投产异常工况与解决措施[J]. 油气储运, 2011, 30(10): 758-760. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201110015.htm

    YU T, GU J D, LIU L J, et al. Abnormal operating condition and its solutions in commissioning operation of Shi-Lan crude oil pipeline[J]. Oil & Gas Storage and Transportation, 2011, 30(10): 758-760. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201110015.htm
    [10]
    丁俊刚, 王中良, 刘佳, 等. 兰成原油管道投产实践[J]. 油气储运, 2015, 34(11): 1198-1201. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201511014.htm

    DING J G, WANG Z L, LIU J, et al. Commissioning practice of Lanzhou-Chengdu crude oil pipeline[J]. Oil & Gas Storage and Transportation, 2015, 34(11): 1198-1201. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201511014.htm
    [11]
    孙云峰, 王中良, 王力, 等. 兰成原油管道投产问题分析及处理[J]. 管道技术与设备, 2016(1): 19-21. https://www.cnki.com.cn/Article/CJFDTOTAL-GDGS201601007.htm

    SUN Y F, WANG Z L, WANG L, et al. Analysis and dispose during production and operation of Lancheng oil pipeline[J]. Pipeline Technique and Equipment, 2016(1): 19-21. https://www.cnki.com.cn/Article/CJFDTOTAL-GDGS201601007.htm
    [12]
    孔维维. 兰郑长成品油管道投产运行及动态模拟分析[D]. 北京: 中国石油大学(北京), 2011: 23-32.

    KONG W W. The commissioning and dynamic simulation of LZC products pipeline[D]. Beijing: China University of Petroleum(Beijing), 2011: 23-32.
    [13]
    高发连, 刘双双, 付强. 西部成品油管道空管投油的技术分析[J]. 油气储运, 2006, 25(11): 58-60. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY200611019.htm

    GAO F L, LIU S S, FU Q. Feasibility study on direct commissioning for Western Products Oil Pipeline[J]. Oil & Gas Storage and Transportation, 2006, 25(11): 58-60. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY200611019.htm
    [14]
    许玉磊, 翟培君, 郭锴, 等. 兰郑长成品油管道投产方式研究[J]. 管道技术与设备, 2015(2): 75-77. https://www.cnki.com.cn/Article/CJFDTOTAL-GDGS201502027.htm

    XU Y L, ZHAI P J, GUO K, et al. Commissioning methods of the Lan-Zheng-Chang Product Pipeline[J]. Pipeline Technique and Equipment, 2015(2): 75-77. https://www.cnki.com.cn/Article/CJFDTOTAL-GDGS201502027.htm
    [15]
    郭哲. 大落差管道液顶气流动过程分析[D]. 北京: 中国石油大学(北京), 2010: 4-5.

    GUO Z. The analysis of flow for commissioning in a long slope pipeline[D]. Beijing: China University of Petroleum(Beijing), 2010: 4-5.
    [16]
    张强. 西部原油成品油管道投产及工艺控制技术研究[D]. 北京: 中国石油大学(北京), 2009: 5-8.

    ZHANG Q. Investigation on commissioning and controlling techniques of the West Product Pipeline[D]. Beijing: China University of Petroleum (Beijing), 2009: 5-8.
    [17]
    李晓平, 邓涛, 周军, 等. 长距离油气管道试压排水不满流分析软件[J]. 化工机械, 2014, 41(4): 523-527. https://www.cnki.com.cn/Article/CJFDTOTAL-HGJX201404032.htm

    LI X P, DENG T, ZHOU J, et al. Analysis software for the pressure test and drainage slack flow of long-distance petroleum pipeline[J]. Chemical Engineering & Machinery, 2014, 41(4): 523-527. https://www.cnki.com.cn/Article/CJFDTOTAL-HGJX201404032.htm
    [18]
    安金龙. 长输管道排水过程中的气阻现象与气阻定律[J]. 石油工程建设, 2010, 36(5): 61-64. https://www.cnki.com.cn/Article/CJFDTOTAL-SYGJ201005007.htm

    AN J L. Air lock phenomenon and law during long-distance pipeline dewatering[J]. Petroleum Engineering Construction, 2010, 36(5): 61-64. https://www.cnki.com.cn/Article/CJFDTOTAL-SYGJ201005007.htm
    [19]
    陈媛媛. 大落差管道下坡段气泡破碎规律研究[D]. 北京: 中国石油大学(北京), 2014: 1-3.

    CHEN Y Y. Study on air entrainment in downhill section of large-slope pipeline[D]. Beijing: China University of Petroleum(Beijing), 2014: 1-3.
    [20]
    李玉星. 姚光镇. 输气管道设计与管理[M]. 东营: 中国石油大学出版社, 2012: 110-112.

    LI Y X, YAO G Z. The design and management of gas transmission pipeline[M]. Dongying: China University of Petroleum Press, 2012: 110-112.
    [21]
    TAITEL Y, DUKLER A E. A model for predicting flow regime transitions in horizontal and near horizontal gas-liquid flow[J]. AIChE Journal, 1976, 22(1): 47-55.
    [22]
    POTHOF I W M, CLEMENS F H L R. Experimental study of air-water flow in downward sloping pipes[J]. International Journal of Multiphase Flow, 2011, 37(3): 278-292.
    [23]
    BEGGS D H, BRILL J P. A study of two-phase flow in inclined pipes[J]. Journal of Petroleum technology, 1973, 25(5): 607-617.
    [24]
    许琛琛, 付璇, 付国庆, 等. 液体管道投产充水段长度及油水混合体积计算方法研究[J]. 辽宁石油化工大学学报, 2015, 35(2): 42-45. https://www.cnki.com.cn/Article/CJFDTOTAL-FSSX201502009.htm

    XU C C, FU X, FU G Q, et al. Calculation on the direct commissioning crafts of the oil pipeline[J]. Journal of Liaoning Shihua University, 2015, 35(2): 42-45. https://www.cnki.com.cn/Article/CJFDTOTAL-FSSX201502009.htm