SHA Shengyi, YAN Bingchuan, JIA Guangming, ZHAO Lianyu, TIAN Shengjie, LIU Yuqiu, YU Zhibo. Full-scale dent rebound test of X65 steel oil pipeline[J]. Oil & Gas Storage and Transportation, 2016, 35(5): 475-477, 502. DOI: 10.6047/j.issn.1000-8241.2016.05.004
Citation: SHA Shengyi, YAN Bingchuan, JIA Guangming, ZHAO Lianyu, TIAN Shengjie, LIU Yuqiu, YU Zhibo. Full-scale dent rebound test of X65 steel oil pipeline[J]. Oil & Gas Storage and Transportation, 2016, 35(5): 475-477, 502. DOI: 10.6047/j.issn.1000-8241.2016.05.004

Full-scale dent rebound test of X65 steel oil pipeline

More Information
  • Received Date: April 01, 2015
  • Revised Date: September 16, 2015
  • Available Online: August 20, 2023
  • Published Date: March 28, 2016
  • Dents may negatively affect pipeline service safety and accessibility of the pigs or inspection detectors. To predict the rebound conditions after removal of the stone support and improve the understanding to fitness for service assessment, full-scale dent rebound test was conducted for an X65 steel oil pipeline in China. The test results show that both dents of smooth type and sharp type have rebound over 40%, and degrees of such rebound decrease with increases in depths of such dents. Through excavation test of pipeline bottom dents, it is found that actual measured results coincide well with above test results. Due to impacts of actual forms, eclipse deformation, pressures, scratches and other factors related to metallic losses, actual measurements reveal higher dispersity.
  • [1]
    李明菲. 在役长输油气管道管体凹陷检测评价研究进展[C]. 廊坊: 中国CIPC国际管道会议, 2013: 194-196.

    LI M F. Progress in the inspection and assessment of dents in oil and gas pipeline[C]. Langfang: China International Oil & Gas Pipeline Conference, 2013: 194-196.
    [2]
    焦中良, 帅健. 含凹陷管道的完整性评价[J]. 西南石油大学学报, 2011, 33(4): 157-164. https://www.cnki.com.cn/Article/CJFDTOTAL-XNSY201104032.htm

    JIAO Z L, SHUAI J. Integrity assessment of pipeline with dent[J]. Journal of Southwest Petroleum University, 2011, 33 (4): 157-164. https://www.cnki.com.cn/Article/CJFDTOTAL-XNSY201104032.htm
    [3]
    KYU J Y, YONG K L, KYU H O. Integrity assessment of API 5L X65 and X70 pipelines with mechanical damages[C]. Calgary: 9th International Pipeline Conference, 2012: 7-9.
    [4]
    HANS O H, JOE B, DAVID K, et al. Fitness for service of dents associated with metal loss due to corrosion[C]. Calgary: 10th International Pipeline Conference, 2014: 4-6.
    [5]
    ARUMUGAM U, GAO M. Root cause analysis of dent with crack[C]. Calgary: 9th International Pipeline Conference, 2012: 1-2.
    [6]
    WANGR Y, KANIAR A. Combined approach to characterization of dent with metal loss[C]. Calgary: 9th International Pipeline Conference, 2012: 2-4.
    [7]
    HUSAIN M A, ABUL A F M. Integrity assessment of interaction of dents with residual stresses of welds using probabilistic design analysis[C]. Calgary: 9th International Pipeline Conference, 2012: 1-2.
    [8]
    陈健, 雷铮强, 王富祥, 等. 基于有限元方法的含凹陷油气管道应变分析[C]. 贵阳: 中国计算力学大会, 2014: 2-3.

    CHEN J, LEI Z Q, WANG F X, et al. Finite-element based strain analysis of oil and gas pipeline containing dents[C]. Guiyang: China Computational Mechanics Conference, 2014: 2-3.
    [9]
    SANJAY T, VLADO S, AARON D, et al. Full scale cyclic fatigue testing of dented pipelines and development of a validated dented pipe finite element model[C]. Calgary: 9th International Pipeline Conference, 2012: 4-5.
    [10]
    HANIF W, KENNY S. Mechanical damage and fatigue assessment of dented pipelines using FEA[C]. Calgary: 10th International Pipeline Conference, 2014: 3-6.

Catalog