ZHOU Xuejing. Batch planning for products pipeline network[J]. Oil & Gas Storage and Transportation, 2016, 35(3): 285-289. DOI: 10.6047/j.issn.1000-8241.2016.03.010
Citation: ZHOU Xuejing. Batch planning for products pipeline network[J]. Oil & Gas Storage and Transportation, 2016, 35(3): 285-289. DOI: 10.6047/j.issn.1000-8241.2016.03.010

Batch planning for products pipeline network

More Information
  • Received Date: March 30, 2015
  • Revised Date: August 15, 2015
  • Available Online: August 20, 2023
  • Published Date: September 09, 2015
  • This paper reviews available techniques for batch planning for products pipeline network. By using these techniques, a feasible solution is defined for batch planning. Researches are conducted on batch planning for the pipeline network composed by Western Oil Products Pipeline, Lanzhou-Zhengzhou-Changsha Oil Products Pipeline and Lanzhou-Chengdu-Chongqing Oil Products Pipeline. Based on the batch planning algorithm for individual product pipeline, the model assumptions, constraints and principles for batch planning for products pipeline network are analyzed. With consideration to oil inventories at junctions of pipelines, refinery output and oil demand downstream the pipelines, this paper proposes a batch planning algorithm and gets input and offtake plans of products pipeline networks in the principle of "first full, first transport". According to the model and algorithm, the tabulated batch planning for the entire pipeline network is generated by using the C language. Using the program, information such as distribution starting time, termination time and offtake volume can be obtained. It can effectively improve efficiency of the batch planning and provide the basis for pipeline network scheduling.
  • [1]
    谢成, 陈新奎, 郭俊昌. 长输管道油品批次管理的实现方法[J]. 油气储运, 2008, 27(9): 25-29. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY200809009.htm

    XIE C, CHEN X K, GUO J C. Method for realizing batch management of long distance oil product pipelines[J]. Oil & Gas Storage and Transportation, 2008, 27(9): 25-29. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY200809009.htm
    [2]
    黄维和, 郑洪龙, 王婷. 我国油气管道建设运行管理技术及发展展望[J]. 油气储运, 2014, 33(12): 1259-1262. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201412001.htm

    HUANG W H, ZHENG H L, WANG T. Construction and operation management technology and prospect of oil and gas pipelines in China[J]. Oil & Gas Storage and Transportation, 2014, 33(12): 1259-1262. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201412001.htm
    [3]
    刘静, 郭强, 姜夏雪, 等. 新运行模式下的大西南管道调度计划编制软件[J]. 油气储运, 2013, 32(9): 986-989. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201309015.htm

    LIU J, GUO Q, JIANG X X, et al. Scheduling software for Great Southwest Pipeline under new operation mode[J]. Oil & Gas Storage and Transportation, 2013, 32(9): 986-989. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201309015.htm
    [4]
    李季, 张吉军, 高海燕, 等. 西部成品油管道调度计划自动编制程序的开发及应用[J]. 信息安全与技术, 2013, 4(4): 86-89. https://www.cnki.com.cn/Article/CJFDTOTAL-AQJS201304030.htm

    LI J, ZHANG J J, GAO H Y, et al. Development and application of Western Oil Product Pipeline scheduling the plan auto preparation program[J]. Information Security and Technology, 2013, 4(4): 86-89. https://www.cnki.com.cn/Article/CJFDTOTAL-AQJS201304030.htm
    [5]
    REJOWSKI R, PINTO J M. Scheduling of a multiproduct pipeline system[J]. Computers & Chemical Engineering, 2003, 27(8): 1229-1246.
    [6]
    范立华, 公茂柱, 张佳. 抚锦成品油管道不同注入方案比选[J]. 油气储运, 2015, 34(3): 319-322. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201503021.htm

    FAN L H, GONG M Z, ZHANG J. Comparison of injection schemes for Fushun-Jinzhou Oil Products Pipeline[J]. Oil & Gas Storage and Transportation, 2015, 34(3): 319-322. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201503021.htm
    [7]
    高发连, 刘双双, 付强. 西部成品油管道空管投油的技术分析[J]. 油气储运, 2006, 25(11): 58-60. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY200611019.htm

    GAO F L, LIU S S, FU Q. Study on direct commissioning for Western Products Oil Pipeline[J]. Oil & Gas Storage and Transportation, 2006, 25(11): 58-60. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY200611019.htm
    [8]
    李明, 梁永图, 宫敬, 等. 成品油管道调度计划制定中应考虑的因素[J]. 油气储运, 2007, 26(7): 54-57. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY200707015.htm

    LI M, LIANG Y T, GONG J, et al. Several factors about scheduling of multi-product pipeline[J]. Oil & Gas Storage and Transportation, 2007, 26(7): 54-57. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY200707015.htm
    [9]
    梁永图, 郝丰斐, 张晓海. 温度影响下的成品油管道油品批次界面跟踪[J]. 油气储运, 2013, 32(2): 121-124. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201302006.htm

    LIANG Y T, HAO F F, ZHANG X H. Interface tracking to the oil batch of products pipeline under the influence of temperature[J]. Oil & Gas Storage and Transportation, 2013, 32(2): 121-124. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY201302006.htm
    [10]
    宋飞, 梁静华, 李会朵, 等. 成品油管道调度计划软件的开发与应用[J]. 油气储运, 2004, 23(2): 5-7. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY200810013.htm

    SONG F, LIANG J H, LI H D, et al. The development and application of pipeline schedule and simuiation software for products pipeline[J]. Oil & Gas Storage and Transportation, 2004, 23(2): 5-7. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY200810013.htm
    [11]
    王立贵. 单管道多油品顺序运输的调度优化[J]. 西安交通大学学报(社会科学版), 2008, 28(5): 32-38. https://www.cnki.com.cn/Article/CJFDTOTAL-XAJD200805005.htm

    WANG L G. Research of optimal scheduling of multi-product transportation based on single pipeline system[J]. Journal of Xi'an Jiaotong University(Social Sciences), 2008, 28(5): 32-38. https://www.cnki.com.cn/Article/CJFDTOTAL-XAJD200805005.htm
    [12]
    储祥萍, 宫敬. 油品实现顺序输送的自动排序[J]. 管道技术与设备, 1997(5): 4-6. https://www.cnki.com.cn/Article/CJFDTOTAL-GDGS705.001.htm

    CHU X P, GONG J. Realizing batch pipelining automatic sorting of oil[J]. Pipeline Technology and Equipment, 1997(5): 4-6. https://www.cnki.com.cn/Article/CJFDTOTAL-GDGS705.001.htm
    [13]
    宋飞, 朱峰, 梁静华, 等. 成品油管道调度计划自动编制系统的开发[J]. 油气储运, 2007, 26(3): 5-7. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY200703001.htm

    SONG F, ZHU F, LIANG J H, et al. The development and application of the automatic pipeline scheduling system[J]. Oil & Gas Storage and Transportation, 2007, 26(3): 5-7. https://www.cnki.com.cn/Article/CJFDTOTAL-YQCY200703001.htm