Qin Zhenquan, Zhao Wenyu, Zhou Yu. Installation quality controls for process equipment of large-scope compressor station[J]. Oil & Gas Storage and Transportation, 2012, 31(8): 626-628. DOI: 10.6047/j.issn.1000-8241.2012.08.019
Citation: Qin Zhenquan, Zhao Wenyu, Zhou Yu. Installation quality controls for process equipment of large-scope compressor station[J]. Oil & Gas Storage and Transportation, 2012, 31(8): 626-628. DOI: 10.6047/j.issn.1000-8241.2012.08.019

Installation quality controls for process equipment of large-scope compressor station

  • Combined with the installation practice of compressors in West-to-East Gas Pipeline, starting from the quality control of process equipment area, the key points and difficultiesin construction of large-scope compressor stations are analyzed, including manifold line-up and welding, and quality control in separator area and quality control of 30° elbow line-up. This paper mainly presents the requirements and methods in cutting of straight sections of manifold and pre-heating/contraction of manifold seams, manifold cleaning, separator alignment and leveling, providing valuable experience to the construction of large-scope compressor station.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return