Wang Hongxi, Sun Sheng, Wu Zhonglin, Guan Zhongyuan. Recovery and process of stations vent gas in West-to-East Gas Pipeline[J]. Oil & Gas Storage and Transportation, 2012, 31(5): 363-365. DOI: 10.6047/j.issn.1000-8241.2012.05.010
Citation: Wang Hongxi, Sun Sheng, Wu Zhonglin, Guan Zhongyuan. Recovery and process of stations vent gas in West-to-East Gas Pipeline[J]. Oil & Gas Storage and Transportation, 2012, 31(5): 363-365. DOI: 10.6047/j.issn.1000-8241.2012.05.010

Recovery and process of stations vent gas in West-to-East Gas Pipeline

  • Gas venting in compressor station and offtake station in the long-distance gas pipeline mainly includes emergency venting and plannedventing. The former has randomness with big volume gas venting in a turn, usually free of technical condition to recover, and the lattermainly refers to separator blow-off venting and periodic maintenance venting of compressors, with confirmed plans or periodicity andrecovery economy. Statistics shows that the gas venting from compressor maintenance and separator blow-off accounts for more than 50% of the total venting volume in stations of West-to-East Gas Pipeline. Therefore, it is feasible and necessary to recover vented natural gas. To this end, a station vent natural gas recovery processing system with the core of CNG compressors is designed, which can recover the vented natural gas produced from equipment maintenance and blow-off in the station and re-inject it into the upstream pipeline, downstream pipeline or offtake pipeline to achieve the goal of energy saving and emission reduction.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return