ZHANG Qiong. Relative Technology Problems in Construction and Operation for Brine Transportation Pipeline[J]. Oil & Gas Storage and Transportation, 2009, 28(9): 61-62. DOI: 10.6047/j.issn.1000-8241.2009.09.020
Citation: ZHANG Qiong. Relative Technology Problems in Construction and Operation for Brine Transportation Pipeline[J]. Oil & Gas Storage and Transportation, 2009, 28(9): 61-62. DOI: 10.6047/j.issn.1000-8241.2009.09.020

Relative Technology Problems in Construction and Operation for Brine Transportation Pipeline

  • Taking Huai'an-Guandong Brine Transportation Pipeline as an example, primary environmental pollution and relative prevention measures for the brine transportation pipeline during construction and operation period are introduced.Influence of the pipeline project on ecological environment and relative control measures are presented.It is set forth that pipeline protection measures should be taken to protect the pipeline from leakage accident from the viewpoint of pipeline design.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return