LIU Rungang, YANG Haijun. Pre-maintenance of New Valve before Operating[J]. Oil & Gas Storage and Transportation, 2009, 28(7): 69-72, 78. DOI: 10.6047/j.issn.1000-8241.2009.07.021
Citation: LIU Rungang, YANG Haijun. Pre-maintenance of New Valve before Operating[J]. Oil & Gas Storage and Transportation, 2009, 28(7): 69-72, 78. DOI: 10.6047/j.issn.1000-8241.2009.07.021

Pre-maintenance of New Valve before Operating

  • The paper describes the necessity of new valves'pre-maintain before operation, introduces preliminary preparation and maintenance steps for the new valves before operation. Valve maintenance is divided into three parts, that is, (1)valve maintenance before installation and welding; (2)inspection and maintenance during pressure testing and(3)maintenance and repair for "problem" valve before putting into operation. Requirements for valve installation and welding are presented.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return