YANG Xuemei, LI Hongqi, . The Influence of ON/OFF Period and its Relative Factors on CIPS Measurement Results[J]. Oil & Gas Storage and Transportation, 2008, 27(5): 51-55. DOI: 10.6047/j.issn.1000-8241.2008.05.015
Citation: YANG Xuemei, LI Hongqi, . The Influence of ON/OFF Period and its Relative Factors on CIPS Measurement Results[J]. Oil & Gas Storage and Transportation, 2008, 27(5): 51-55. DOI: 10.6047/j.issn.1000-8241.2008.05.015

The Influence of ON/OFF Period and its Relative Factors on CIPS Measurement Results

  • In this paper, the relations of ON/OFF period, ON/OFF time ratio and delay time of data acquisition between CIPS's measurement results are determined by means of field measurement on oil pipeline. It is pointed out that field measurement should be made before CIPS measurement so as to get such rational parameters as ON/OFF period, ON/OFF time ratio and delay time of data acquisition.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return