LuNing Oil Pipeline Takes Energy Saving Measures to Increase Economic Profits
-
-
Abstract
Oil throughput in LuNing Oil Pipeline is increased after the regulation to oil flowing direction of Eastern Pipeline Networks. To meet the demands of oil transportation, first-phase and second-phase technical modifications on pump sets of running pumping stations are carried out. Technical measures for installing frequency converters to the second-phase modified pump sets are taken, and theory and operation practice prove that a remarkable energy saving result is obtained.
-
-