LI Ming, LIANG Yongtu, . Several Factors about Scheduling of Multi-product Pipeline[J]. Oil & Gas Storage and Transportation, 2007, 26(7): 54-57. DOI: 10.6047/j.issn.1000-8241.2007.07.015
Citation: LI Ming, LIANG Yongtu, . Several Factors about Scheduling of Multi-product Pipeline[J]. Oil & Gas Storage and Transportation, 2007, 26(7): 54-57. DOI: 10.6047/j.issn.1000-8241.2007.07.015

Several Factors about Scheduling of Multi-product Pipeline

  • When developing an offtaking schedule for a multi-product pipeline, some factors are involved, these are batch, transporting sequence, market demand, minimum continuous flowrate of pump, optimal operating range of the flowmeter, minimum flowrate of the pipeline and tank capacity of each station. With a Schedule Software of Multi-product Pipeline programmed by authors and in the case of Southwest Multi-product Pipeline, authors point out that the above factors have to be emphasized before developing an offtaking plan.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return