A Study on Transportation Process of Jing'an To Hui'anbao Oil Pipeline
-
-
Abstract
In the light of poor natural condition, multi-sources of oil, multiple inlet and outlet pipeline branches and instable oil inlet in Jing'an To Hui'anbao Oil Pipeline, the technical measures are worked out in adopting tight line transportation process, chemical agent injection and automatic metering of oil. The site application shows that these technical measures effectively solve the problems, which ensure the successful commissioning of the pipeline in 2003.
-
-