WANG Weidong, LIANG Bing, . The Welding Process of Tank Bottom Plate for 150000 m3 Double-Pontoon Floating Roof Oil Tank[J]. Oil & Gas Storage and Transportation, 2005, 24(12): 51-53. DOI: 10.6047/j.issn.1000-8241.2005.12.015
Citation:
WANG Weidong, LIANG Bing, . The Welding Process of Tank Bottom Plate for 150000 m3 Double-Pontoon Floating Roof Oil Tank[J]. Oil & Gas Storage and Transportation, 2005, 24(12): 51-53. DOI: 10.6047/j.issn.1000-8241.2005.12.015
WANG Weidong, LIANG Bing, . The Welding Process of Tank Bottom Plate for 150000 m3 Double-Pontoon Floating Roof Oil Tank[J]. Oil & Gas Storage and Transportation, 2005, 24(12): 51-53. DOI: 10.6047/j.issn.1000-8241.2005.12.015
Citation:
WANG Weidong, LIANG Bing, . The Welding Process of Tank Bottom Plate for 150000 m3 Double-Pontoon Floating Roof Oil Tank[J]. Oil & Gas Storage and Transportation, 2005, 24(12): 51-53. DOI: 10.6047/j.issn.1000-8241.2005.12.015
The Welding Process of Tank Bottom Plate for 150000 m3 Double-Pontoon Floating Roof Oil Tank
In the light of the problems during the tank bottom plate welding of 150 000 m3 double-pontoon floating roof oil tank, the paper analyzes the deformation cause of tank wall shell in welding. It is considered that the rational welding method and anti-deformation measures can effectively avoid the stress concentration of tank wall shell and ensure welding quality.