LI Guibin. Technological Measures of Pipeline Winter Construction for Kenkiyak-Zananor Oil Gathering Pipeline of Kazakhstan[J]. Oil & Gas Storage and Transportation, 2005, 24(10): 44-45. DOI: 10.6047/j.issn.1000-8241.2005.10.013
Citation: LI Guibin. Technological Measures of Pipeline Winter Construction for Kenkiyak-Zananor Oil Gathering Pipeline of Kazakhstan[J]. Oil & Gas Storage and Transportation, 2005, 24(10): 44-45. DOI: 10.6047/j.issn.1000-8241.2005.10.013

Technological Measures of Pipeline Winter Construction for Kenkiyak-Zananor Oil Gathering Pipeline of Kazakhstan

  • This paper describes the technological measures for pipeline winter construction of Kenkiyak-Zananor Oil Pipeline of Kazakhstan, revolved in pipe welding, pipe towing and installation, pipe coating, equipment maintenance and HSE/OSH management.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return