YOU Zebin, GUO Yi, . The Comparison and Selection on Water Filling Method for Newly-built Pipeline[J]. Oil & Gas Storage and Transportation, 2005, 24(5): 57-59. DOI: 10.6047/j.issn.1000-8241.2005.05.017
Citation: YOU Zebin, GUO Yi, . The Comparison and Selection on Water Filling Method for Newly-built Pipeline[J]. Oil & Gas Storage and Transportation, 2005, 24(5): 57-59. DOI: 10.6047/j.issn.1000-8241.2005.05.017

The Comparison and Selection on Water Filling Method for Newly-built Pipeline

  • The characteristics and suitability of single-point and multiple-point water filling method for newly-built liquid pipeline are introduced. The authors analyze and compare the water filling methods combined with the pipeline route and actual geology for Lanzhou-Chengdu-Chongqing Products Pipeline. It is pointed out that the single-point water filling method is suitable for the pipeline located at the sharp elevation and hills.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return