ZHU Bo, LV Jianfeng, . Characteristic Analysis on Huaihe River Pipeline Crossing by Horizontal Directional Drilling Technology[J]. Oil & Gas Storage and Transportation, 2005, 24(3): 51-54. DOI: 10.6047/j.issn.1000-8241.2005.03.016
Citation: ZHU Bo, LV Jianfeng, . Characteristic Analysis on Huaihe River Pipeline Crossing by Horizontal Directional Drilling Technology[J]. Oil & Gas Storage and Transportation, 2005, 24(3): 51-54. DOI: 10.6047/j.issn.1000-8241.2005.03.016

Characteristic Analysis on Huaihe River Pipeline Crossing by Horizontal Directional Drilling Technology

  • This paper describes utilizing the horizontal directional drilling (HDD) technology to cross Huaihe River for Zhumadian-Xinyang Gas Pipeline. The geological condition and allocation of drilling equipment are introduced. The design factors in angle of arrival, angle of outlet, curvature radius and depth of drilling are determined. The stressed property of pilot drilling, reaming and pull-back and calculation method are analyzed. The relevant solution to technical issues is presented.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return