Safety Assessment on Pipeline Reinforcement of Tangbaihe River Pipeline Crossing Segment
-
Graphical Abstract
-
Abstract
Tangbaihe River pipeline crossing segment is 500 m long, because natural and human factors, the operation condition of this pipe segment does not meet the needs of safety standard. Based on the geological analysis results, systematical reinforcement measures are taken. The safety assessment is made on the reinforcement. The authors consider that the reinforcement method is feasible in technology.
-
-