Comprehensive Commissioning Technology for the East-section Pipeline of West-to-East Gas Transmission Pipeline
-
-
Abstract
This paper introduces the comprehensive commissioning technology for the East-section Pipeline (Shanghai-Jingbian Pipeline Section) of West-to-East Gas Transmission Pipeline, including the operation steps involved in pigging, calibration, water test and dewatering. It is considered that the comprehensive commissioning technology can be taken as an important criterion for other pipeline construction.
-
-