LI Li, GAO Yanqing. Technical Study on the Pipeline Run with Additive at Low-throughput Condition[J]. Oil & Gas Storage and Transportation, 2003, 22(4): 31-34. DOI: 10.6047/j.issn.1000-8241.2003.04.008
Citation: LI Li, GAO Yanqing. Technical Study on the Pipeline Run with Additive at Low-throughput Condition[J]. Oil & Gas Storage and Transportation, 2003, 22(4): 31-34. DOI: 10.6047/j.issn.1000-8241.2003.04.008

Technical Study on the Pipeline Run with Additive at Low-throughput Condition

  • The oil throughput of WeiJing Oil Pipeline decreases year by year, which may resu lt in operation accident. For this potential problem, a new transportation techno logy with pour point depressant is used. The laboratory selection and assessment on GY-3 PPD to be added to oil are carried out. The result of site test shows t hat the oil throughput of pipeline is successfully reduce d from 5000 t/d to 250 0 t/d.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return