WU Xiaobing, TONG Wen, . Stress Analysis on the One-time Horizontally Directional Drilling Crossing for Products Pipeline in Qiantangjiang River[J]. Oil & Gas Storage and Transportation, 2003, 22(1): 49-51. DOI: 10.6047/j.issn.1000-8241.2003.01.014
Citation: WU Xiaobing, TONG Wen, . Stress Analysis on the One-time Horizontally Directional Drilling Crossing for Products Pipeline in Qiantangjiang River[J]. Oil & Gas Storage and Transportation, 2003, 22(1): 49-51. DOI: 10.6047/j.issn.1000-8241.2003.01.014

Stress Analysis on the One-time Horizontally Directional Drilling Crossing for Products Pipeline in Qiantangjiang River

  • Based on the dynamic simulation calculation on the HDD crossing of Qiant angjiang River for the Zhenhai Refinery-Kangqiao of Hangzhou products pipeline project, three mathematic models used in different crossing conditions, such as pilot hole, prereaming and pullback, for the HDD crossing are established. Through the FEM calculation, the result of stressed condition of each node of crossing course is obtained, which provides a theoretical fundament to the HDD crossing design of Qiantangjiang River. As a resuit, one-time crossing of 2308m in Qiantangjiang River successfully hit the project target.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return