DONG Zhengmiao, SU Liu. The Process Design for Kelamaye-Urumchi Initial Station of Products Pipeline[J]. Oil & Gas Storage and Transportation, 2002, 21(10): 13-15. DOI: 10.6047/j.issn.1000-8241.2002.10.004
Citation: DONG Zhengmiao, SU Liu. The Process Design for Kelamaye-Urumchi Initial Station of Products Pipeline[J]. Oil & Gas Storage and Transportation, 2002, 21(10): 13-15. DOI: 10.6047/j.issn.1000-8241.2002.10.004

The Process Design for Kelamaye-Urumchi Initial Station of Products Pipeline

  • Kelamayi-Urumchi Products Pipeline, 287 km in total length, 273 mm in diameter, 90×104 t/a in capacity and 6.0 MPa, transports #70 and #90‘ gasoline, #0 and #-10 diesel. The authors analyze the process flow of the pipeline with batch transportation method, study the running combination ways of pump sets, the design of station pipeline network, products switchover and pressure adjustment, summarize the key point of batch transportation process, which will provide to other products pipelines for reference.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return