Wang Yijian, Ma Jian. Construction Progress Control of Sebei-Xi'ning-Lanzhou Gas Transmission Pipeline[J]. Oil & Gas Storage and Transportation, 2001, 20(8): 24-26. DOI: 10.6047/j.issn.1000-8241.2001.08.007
Citation: Wang Yijian, Ma Jian. Construction Progress Control of Sebei-Xi'ning-Lanzhou Gas Transmission Pipeline[J]. Oil & Gas Storage and Transportation, 2001, 20(8): 24-26. DOI: 10.6047/j.issn.1000-8241.2001.08.007

Construction Progress Control of Sebei-Xi'ning-Lanzhou Gas Transmission Pipeline

  • Applying the control theory of project, combined with the experience in pipeline construction, construction/management mode for Sebei-Xi'ning-Lanzhou gas transmission pipeline has been established. A total analysis on materials procurement.shipment, field allocation, statistics/analysis of construction progress data, prediction and implement of schedule has been conducted. The authors consider that the control object of project schedule can be realized in the precondition of fulfilling month-schedule in allocating resources on a timely and reasonable basis.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return