Pigging and Final Pressure Test on Sudanese Oil Pipeline
-
-
Abstract
The procedure of final pressure test between stations (other than that used in China) for Sudanese oil pipeline is introduced. The site pressure test process is that the final pressure test between stations is not conducted after pressure test have been carried out in pipe sections, which elongates the max. length of pipe test sections and solves the problem existed in the water supply.
-
-