Li Jun. Pigging and Final Pressure Test on Sudanese Oil Pipeline[J]. Oil & Gas Storage and Transportation, 2001, 20(4): 43-44. DOI: 10.6047/j.issn.1000-8241.2001.04.012
Citation: Li Jun. Pigging and Final Pressure Test on Sudanese Oil Pipeline[J]. Oil & Gas Storage and Transportation, 2001, 20(4): 43-44. DOI: 10.6047/j.issn.1000-8241.2001.04.012

Pigging and Final Pressure Test on Sudanese Oil Pipeline

  • The procedure of final pressure test between stations (other than that used in China) for Sudanese oil pipeline is introduced. The site pressure test process is that the final pressure test between stations is not conducted after pressure test have been carried out in pipe sections, which elongates the max. length of pipe test sections and solves the problem existed in the water supply.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return