column
Technical support system for development and engineering application of transmission pipe product
LI Helin, HUO Chunyong, CHI Qiang, DU Wei
2020, 39(7): 721-729. DOI: 10.6047/j.issn.1000-8241.2020.07.001
Abstract FullText HTML PDF
Key technological innovations and thinking of pipeline intelligence in China-Russia Eastern Gas Pipeline
WANG Zhensheng, CHEN Pengchao, WANG Juhong
2020, 39(7): 730-739. DOI: 10.6047/j.issn.1000-8241.2020.07.002
Abstract FullText HTML PDF
Key factors for safety improvement design of girth weld in high-grade large diameter natural gas pipelines
ZHANG Zhenyong
2020, 39(7): 740-748. DOI: 10.6047/j.issn.1000-8241.2020.07.003
Abstract FullText HTML PDF
Localization of key equipment and core control system in north section of China-Russia Eastern Gas Pipeline
LI Baisong, XU Bo, WANG Juhong, ZHANG Shu, WANG Baochun, YANG Xiliang, GAO Xiguang, SHI Qian
2020, 39(7): 749-755. DOI: 10.6047/j.issn.1000-8241.2020.07.004
Abstract FullText HTML PDF
Full life cycle data management of oil and gas pipeline and its application in China-Russia Eastern Gas Pipeline
JIA Shaohui, ZHANG Xinjian, LI Yan, XU Jie, CHEN Panxi
2020, 39(7): 756-762, 820. DOI: 10.6047/j.issn.1000-8241.2020.07.005
Abstract FullText HTML PDF
Identification and evaluation on bending deformation of China-Russia Eastern Gas Pipeline
ZHAO Xiaoming, LI Rui, CHEN Pengchao, FENG Wenxing, FU Kuan, ZHENG Jianfeng, LIU Yang
2020, 39(7): 763-768. DOI: 10.6047/j.issn.1000-8241.2020.07.006
Abstract FullText HTML PDF
Numerical simulation of stress intensity factor at axial through-wall crack tip of pipeline
LIU Qinggang, ZHANG Xiongfei, WANG Wenhe, LIU Bojiang
2020, 39(7): 769-776. DOI: 10.6047/j.issn.1000-8241.2020.07.007
Abstract FullText HTML PDF
Digital handover of China-Russia Eastern Gas Pipeline and docking with integrity management system
OU Xinwei, CHEN Pengchao, REN Kai, LI Yibo, CHEN Panxi
2020, 39(7): 777-782. DOI: 10.6047/j.issn.1000-8241.2020.07.008
Abstract FullText HTML PDF
Evaluation on fracture toughness of welded joint of X65+Inconel 625 composite pipeline
LUAN Chenjie
2020, 39(7): 783-787. DOI: 10.6047/j.issn.1000-8241.2020.07.009
Abstract FullText HTML PDF
Influence of different faults on stress performance of buried pipelines
ZENG Xi, LEI Zhen, JIN Fangqian, DU Guofeng
2020, 39(7): 788-800. DOI: 10.6047/j.issn.1000-8241.2020.07.010
Abstract FullText HTML PDF
Experiment on soluble properties of different types of salt rocks
ZHU Huayin, WU Zhide, ZHANG Min, SHI Lei
2020, 39(7): 801-807. DOI: 10.6047/j.issn.1000-8241.2020.07.011
Abstract FullText HTML PDF
Unsteady numerical simulation of cryogenic LNG expander
HUANG Ning, LI Zhenlin
2020, 39(7): 808-812. DOI: 10.6047/j.issn.1000-8241.2020.07.012
Abstract FullText HTML PDF
Application of Beidou positioning technology in pipeline geological hazard monitoring and early warning
ZHANG Hongkui
2020, 39(7): 813-820. DOI: 10.6047/j.issn.1000-8241.2020.07.013
Abstract FullText HTML PDF
Hydrate prediction, prevention and control simulation at the initial stage of commissioning of China-Russia Eastern Gas Pipeline
ZHANG Kejia, LI Changjun, OUYANG Xin, WANG Yubin, JIA Wenlong
2020, 39(7): 821-826. DOI: 10.6047/j.issn.1000-8241.2020.07.014
Abstract FullText HTML PDF
Development and application of self-driven inner detector for D 1 422 mm pipelines before commissioning
ZHENG Jianfeng, LI Rui, FU Kuan, YU Zhibo, CHEN Pengchao, ZHAO Xiaoming, JIA Guangming
2020, 39(7): 827-833. DOI: 10.6047/j.issn.1000-8241.2020.07.015
Abstract FullText HTML PDF
Contents and technical requirements for overhaul of Ruhr pumps
PU Bin, YAN Wendong
2020, 39(7): 834-840. DOI: 10.6047/j.issn.1000-8241.2020.07.016
Abstract FullText HTML PDF