column
Prospect prediction of domestic natural gas pipeline industry
Pan Jiahua
2011, 30(8): 601-602.
Abstract FullText HTML PDF
Application prospect of The Internet of Things technology for oil and gas pipelines
Cui Hongsheng, Wei Zheng
2011, 30(8): 603-607. DOI: CNKI:13-1093/TE.20110622.1105.001
Abstract FullText HTML PDF
The research progress of gas pipeline leak model
Sang Bo, Lan Huiqing, Yu Xueli, , ,
2011, 30(8): 608-613.
Abstract FullText HTML PDF
Displacement commissioning of the A-line modified section of China-Uzbekistan Gas Pipeline
Jiang Jintian, Gao Bin
2011, 30(8): 614-618.
Abstract FullText HTML PDF
Application of backtow flotage balance technology in horizontal directional drilling engineering
Zhang Jie, Zhou Zhaoxia, Ye Wenjian,
2011, 30(8): 619-620, 633.
Abstract FullText HTML PDF
Geological disaster risk analysis and management solutions for Mohe-Daqing Oil Pipeline in permafrost regions
Chen Pengchao, Yang Baoling, Wang Min
2011, 30(8): 621-623. DOI: CNKI:13-1093/TE.20110517.2019.002
Abstract FullText HTML PDF
Rain-flow counting analysis of the fluctuation pressure for oil & gas pipelines
Jiao Zhongliang, Li Zhiwen, Li Zhiyong,
2011, 30(8): 624-628. DOI: CNKI:13-1093/TE.20110517.2028.003
Abstract FullText HTML PDF
Quantitative seismic risk assessment method of atmospheric storage tank
Chen Shicheng, Zhou Changyu
2011, 30(8): 629-633. DOI: CNKI:13-1093/TE.20110721.1720.004
Abstract FullText HTML PDF
Leakage explosion consequence simulation based on CFD for liquid hydrocarbon tankfarms
Zhao Xiangdi, Yuan Jiwu, Zhai Liangyun, , ,
2011, 30(8): 634-636, 651.
Abstract FullText HTML PDF
Service life prediction of pipeline under hydrogen-induced microcrack stress corrosion
Li Tieming, Wang Zhibin, Shi Hongyan
2011, 30(8): 637-639. DOI: CNKI:13-1093/TE.20110721.1704.002
Abstract FullText HTML PDF
Scaling mechanism and water hammer of tubular heater
Li Caixian, Diao Fujun, Jia Chunhua,
2011, 30(8): 640-642.
Abstract FullText HTML PDF
Cumulative-sum method to predict the corrosion limit thickness of in-service pipeline
Yu Guijie, Fu Lei, Zhao Qingna,
2011, 30(8): 643-646. DOI: CNKI:13-1093/TE.20110721.1722.005
Abstract FullText HTML PDF
CFD simulation of urban gas pipeline leakage
Cheng Haoli, Liu Dejun, Long Shihua, , ,
2011, 30(8): 647-651. DOI: CNKI:13-1093/TE.20110721.1733.006
Abstract FullText HTML PDF
Mechanical analysis of frost heaving of pipeline in gas offtake station
Li Kai, Wang Zhifang, Xiang Weidong,
2011, 30(8): 652-656. DOI: CNKI:13-1093/TE.20110721.1650.001
Abstract FullText HTML PDF
Development of high-pressure pipeline isolation plug
Fan Wenbin, Luo Zizhi, Zhang Ce
2011, 30(8): 657-659. DOI: CNKI:13-1093/TE.20110721.1707.003
Abstract FullText HTML PDF
Current situation and development strategy of condition-based maintenance of pipeline compressor sets
Li Gang, Liu Peijun, Wang Shuai, , ,
2011, 30(8): 660-662.
Abstract FullText HTML PDF
Fault resolution of CIP protocol in SCADA system based on the satellite communication and Linux platform
Zhou Yong, Qi Guocheng, Sun Tieliang, , ,
2011, 30(8): 663-667. DOI: CNKI:13-1093/TE.20110412.1145.001
Abstract FullText HTML PDF
Treating method of heavy fractions in the bottom of crude oil tank
Zou Yongsheng, Pang Guiliang, Qiu Shujuan
2011, 30(8): 668-669.
Abstract FullText HTML PDF
Safety risk identification and construction management of pipeline crossing in river tunnel
Wang Zhilun, Dong Hongjun, Yang Wei,
2011, 30(8): 670-672.
Abstract FullText HTML PDF
Reason analysis of poor pour point depression effect for Kazakhstan and Tarim Mixing Crude Oil
Qiu Shujuan
2011, 30(8): 673-674.
Abstract FullText HTML PDF
Hazards of LNG receiving terminal and preventive measures
Yang Kerui, Yin Qingdang
2011, 30(8): 675-676.
Abstract FullText HTML PDF
Technology of air source heating pump and feasibility of its application in Jiangsu Oilfield
Zhang Xinfen, Wu Xue
2011, 30(8): 677-679.
Abstract FullText HTML PDF