column
Process Simulation of the Restart after Shutdown for the Tieling——Qinhuangdao Oil Pipeline
ZHAO Xiaodong, ZHANG Lixin, ,
2002, 21(1): 1-4. DOI: 10.6047/j.issn.1000-8241.2002.01.001
Abstract FullText HTML PDF
Study on the Adjustment of Pressure and Flow Rate for the Branch Pipeline System in Tank Farm
LIU Zhenzhi, CHEN Jun
2002, 21(1): 5-8, 24. DOI: 10.6047/j.issn.1000-8241.2002.01.002
Abstract FullText HTML PDF
Sand-laden Fluid Influences the Integrity of Multiphase Flow Transportation Pipeline
FU Jing, ZHOU Xiaojun
2002, 21(1): 9-11. DOI: 10.6047/j.issn.1000-8241.2002.01.003
Abstract FullText HTML PDF
On Issues of Hydraulic Calculation in Turbulent Transition Region
PU Jianing
2002, 21(1): 12-16. DOI: 10.6047/j.issn.1000-8241.2002.01.004
Abstract FullText HTML PDF
Design of Changed Thickness Insulating Layer around Buried Hot Oil Pipelines
WANG Haiqin
2002, 21(1): 17-19, 31. DOI: 10.6047/j.issn.1000-8241.2002.01.005
Abstract FullText HTML PDF
The Prediction Model Comparison of Gas Hydrate Formation Conditions
YU Xichong, ZHAO Sinzhou, ,
2002, 21(1): 20-24. DOI: 10.6047/j.issn.1000-8241.2002.01.006
Abstract FullText HTML PDF
Development on the Hydraulic Calculation Software of Urban Gas Pipeline Network
LIU Wei, TANG Wenfang, , ,
2002, 21(1): 25-27. DOI: 10.6047/j.issn.1000-8241.2002.01.007
Abstract FullText HTML PDF
An Experimental Study on Oil-Gas-Water Three-Phase Flow Characteristics in Horizontal Pipes
NIU Dongmei, SU Xinjun, , ,
2002, 21(1): 28-31. DOI: 10.6047/j.issn.1000-8241.2002.01.008
Abstract FullText HTML PDF
A New Method Derived the Proportion of Mixed Oil from the Viscosity of Mixed Oil
HUANG Qiyu, MIAO Qing, ,
2002, 21(1): 32-33, 36. DOI: 10.6047/j.issn.1000-8241.2002.01.009
Abstract FullText HTML PDF
The Application of Multiphase Pump Transportation Technique in Oilfield
WANG Shiqing, QIU Xiaoyi
2002, 21(1): 34-36. DOI: 10.6047/j.issn.1000-8241.2002.01.010
Abstract FullText HTML PDF
The Application of HNS Three-phase Separator in a Multi-purpose Station of Oilfield
YAN Guomin, YI Nanhua, ,
2002, 21(1): 37-39. DOI: 10.6047/j.issn.1000-8241.2002.01.011
Abstract FullText HTML PDF
The Application of High-voltage Internal Feedback Cascade Speed Adjustment System in Oil and Gas Gathering Pipeline
YAO Gang, YE Nianyu,
2002, 21(1): 40-41. DOI: 10.6047/j.issn.1000-8241.2002.01.012
Abstract FullText HTML PDF
The Application of Welding Methods in Oil and Gas Pipeline
SHI Xiaozhong, SUN Hongquan
2002, 21(1): 42-45. DOI: 10.6047/j.issn.1000-8241.2002.01.013
Abstract FullText HTML PDF
Installation Technique of Suspension Pipeline Bridge for Long Distance Pipeline
CHEN Xiaoxia, Xiao Shengjun
2002, 21(1): 45-47. DOI: 10.6047/j.issn.1000-8241.2002.01.014
Abstract FullText HTML PDF
The Application of Pipeline Coating Detection Technology in Oilfield Pipelines
SUN Lingnian, OU Jinjun
2002, 21(1): 47-49. DOI: 10.6047/j.issn.1000-8241.2002.01.015
Abstract FullText HTML PDF
The Parameter Measurement and Comparison on the Isolating Property of Pipeline Coating for Buried Steel Pipeline
HU Shixin, GE Aitian, ,
2002, 21(1): 50-55, 59. DOI: 10.6047/j.issn.1000-8241.2002.01.016
Abstract FullText HTML PDF
The Analysis on Crude Oil Loss during Oil Storage and Transportation
ZHANG Min, ZHOU Bin
2002, 21(1): 56-59. DOI: 10.6047/j.issn.1000-8241.2002.01.017
Abstract FullText HTML PDF