column
Prediction of Reliability of Slurry Pipeline System and Its Optimized Distribution
Ding Hongda
1990, 9(6): 1-8.
Abstract FullText HTML PDF
An Account for Pigging the Aershan—Saihantala 0il Pipeline
Ding Mingdong
1990, 9(6): 8-13.
Abstract FullText HTML PDF
Relations between the Characteristics of Pipeline Internal Surface and the Friction of Fluid(2)
Gao Xiqi,
1990, 9(6): 14-20.
Abstract FullText HTML PDF
Elomentary Introduction to the Sereral Methods of Reducing Mixed Oil for Sequential Transportation
Li Ronghua
1990, 9(6): 21-22.
Abstract FullText HTML PDF
Determination for Diameter of Oil Tank Inspiration Piping at Tank Farm
Wang Feng
1990, 9(6): 23-28.
Abstract FullText HTML PDF
Problem for Blocking 0il Dam of Underground Tank
Zhang Wanbing
1990, 9(6): 28-29.
Abstract FullText HTML PDF
Insulation Connecting Technology of Buried Pipeline
Hu Shixin
1990, 9(6): 30-39.
Abstract FullText HTML PDF
Investigation and Analysis on Pipeline Corrosion under Protective Coating
Fan Yunshu
1990, 9(6): 39-44.
Abstract FullText HTML PDF
Adoption of AC Vari-frequency Adjustable Speed Motor on the Tieling-Dalian 0il Pipeline
Zhang Fengzhe
1990, 9(6): 44-49.
Abstract FullText HTML PDF
Pigging Technology of Fuel Pipeline at Airport
Zhang Zehua
1990, 9(6): 50-53.
Abstract FullText HTML PDF
Analysis on Ageing of Motor for oil Transportation
Fu Zhengdong
1990, 9(6): 54-56.
Abstract FullText HTML PDF
Flowing Process of Displacing Technology in LPG Ship
Zhang Zhenxin
1990, 9(6): 57-61.
Abstract FullText HTML PDF