column
The prospects of Cross-Country Pipelines and the Target We Are Driving at
Pan Jia-hua
1984, 3(3): 1-12, 13.
Abstract FullText HTML PDF
The Unprofitable Result of Hydraulic Couplings Being Used in Series-Pumps for Delivering Hot Crude Oil
Zhang Zhao-ming
1984, 3(3): 13-19.
Abstract FullText HTML PDF
Providing the Fixed Vault Tank with a Assembly Floating Disk
Kong Zhao-rui
1984, 3(3): 20-27.
Abstract FullText HTML PDF
Application of the Fire-Extinguishing Technique of Submerged Jetting and Calculation Concerned
Zheng Xue-zhi
1984, 3(3): 28-32.
Abstract FullText HTML PDF
The Optimum of Oil Tank Farm Storage
Cao Han-chang, ,
1984, 3(3): 33-41.
Abstract FullText HTML PDF
Transient Hydraulic Analysis of High Pressure Gas Transmission System
Striplling Travis E., ,
1984, 3(3): 42-49.
Abstract FullText HTML PDF
Analysis of the Influence of the Displacement of Buried Pipes at the Pull-Out Ends on the Arch-Crossing Structure
Zhang Huai-fa
1984, 3(3): 50-58.
Abstract FullText HTML PDF
The Optimum Technique of Oil and Gas Pipelines Operation
Li Shu-wen
1984, 3(3): 59-64.
Abstract FullText HTML PDF