column
Stable operation of the heated oil pipeline in the case of low throughput
1982, 1(4): 1-10.
Abstract FullText HTML PDF
High polymer used to reduce drag and it's application to the pipeline
1982, 1(4): 11-18.
Abstract FullText HTML PDF
Optimum blending of oil products realized by linear programming
,
1982, 1(4): 19-23.
Abstract FullText HTML PDF
The Importance of vertical earthquake load in the design of liquid storage tank——on why the "elephant's foot" phenomenon results
1982, 1(4): 24-29.
Abstract FullText HTML PDF
The design and calculation of the accompanying heat in pipelines
, ,
1982, 1(4): 30-38.
Abstract FullText HTML PDF
patching the leaking points of an oil tank with adhesive
1982, 1(4): 38-39.
Abstract FullText HTML PDF
Closed loading of light oil on trial
1982, 1(4): 40-42.
Abstract FullText HTML PDF
CRJ hose coupling
1982, 1(4): 43-45.
Abstract FullText HTML PDF
A probe into the period of oil pipelines' operation and that of their overhaul
, ,
1982, 1(4): 45-47.
Abstract FullText HTML PDF
Technical and economic analysis of the syncnhronous motors used in long distance pipeline
,
1982, 1(4): 47-51.
Abstract FullText HTML PDF
The feasibility of Shanxi coal being carried out by pipeline
,
1982, 1(4): 52-54.
Abstract FullText HTML PDF
The method of calculating the shortest distance between any two locations on earth and their respective track
1982, 1(4): 55-59.
Abstract FullText HTML PDF
Economize power in the operation of the centrifugal pumps
1982, 1(4): 60-63.
Abstract FullText HTML PDF