Abstract:
According to the practice in construction risk management of gas pipeline in SuZheHu Department of West-East Gas Pipeline in recent years, construction risk management and precontrol measures are introduced, which include objective audit of QHSE before pipeline construction; enhancing employees and operation companies'cognizance of construction risk management by safety education training and cases study, drawing up the "Manual of Construction Risk Precontrol and Management for Natural Gas Pipeline Enterprise" and abiding by it; launching safety analysis before pipeline construction and carrying out the system of construction license; reinforcing the identification of construction risk and the process control; setting up site safety warning markings, etc.. It is by these measures that the construction risks are controlled by SuZheHu Department although there are thousands of projects under construction per year, which guarantee the safety of gas pipelines under running. The practices in risks precontrol of pipeline construction from SuZheHu Department provide examples to the gas transmission enterprises inland.