Abstract:
With the different and complicated constructional features, the problems which cross great or middle rivers in long-distance oil/gas pipelines construction is often encountered and it is also the hinge where this construction lies. Through pipes stabilized gabions crossing Yellow River in Hui-Ning oil pipeline construction, the design and construction for pipes stabilized with gabions is introduced comprehensively, and the key procedures, such as afloat positioning for gate-type gabions slideway, stabilization, gabions throwing and throwing procedures are especially described in detail, the method for pipes stabilized with gabions is in brief evaluated as well.