Abstract:
Based on the experience of developing pipeline industry íor twenty points and the measures of technical reform on existing pipeline system in tie east of China, in accordance with the general policy of strategy as "securing in the east and developing in the west" for the petioleum industry. In addition, the author has made specific ways to deal wit n the construction of western pipeline in special geographical conditions and le has expressed his own po-ints and hopes on such matters as scientific decision and qualified personnel training etc, for the transfer of said strategy.