梁政, 袁祥忠. 埋地长输管道水平弯头升温载荷下的计算问题[J]. 油气储运, 1987, 6(2): 30-36.
引用本文: 梁政, 袁祥忠. 埋地长输管道水平弯头升温载荷下的计算问题[J]. 油气储运, 1987, 6(2): 30-36.
Liang Zheng, . Calculation of Horizontal Bends of Buried Pipelines under Load at Higher Temperature[J]. Oil & Gas Storage and Transportation, 1987, 6(2): 30-36.
Citation: Liang Zheng, . Calculation of Horizontal Bends of Buried Pipelines under Load at Higher Temperature[J]. Oil & Gas Storage and Transportation, 1987, 6(2): 30-36.

埋地长输管道水平弯头升温载荷下的计算问题

Calculation of Horizontal Bends of Buried Pipelines under Load at Higher Temperature

  • 摘要: 本文用“埋地长输管道热胀内力近似分析”2一文所提出的弹性抗弯铰模型, 应用纵穔弯由弹性地基梁理论6,分析了两臂不对称埋地长输管道水平弯头的热胀内力和位移。并对两臂对称埋地水平弯头及镆固撴的过渡段长度进行了讨论。文中还通过算例说明了有关的计算过程。

     

    Abstract: In the light of the elastic anti-bending reflection model as put forward in the paper entitled "Approximate Analysis of the Heat Expansion Inward Force", and the conception that ground elastically bends longitudinally and latitudinally, the article makes an analysis of the heat expansion inward for e and displa ement of borizontal asynmetri al buried bends of long pipelines. Anf ciscussed in it are the buried symmetrial and horizontal bends and the leagtin of transiton section without an hors. Examples are given to show the calculation processe.

     

/