杨宁, 陈忠营, 李松柏, 高兴. X80大变形钢在地震断裂带施工中的应用[J]. 油气储运, 2011, 30(10): 754-755. DOI: CNKI:13-1093/TE.20111011.2016.007
引用本文: 杨宁, 陈忠营, 李松柏, 高兴. X80大变形钢在地震断裂带施工中的应用[J]. 油气储运, 2011, 30(10): 754-755. DOI: CNKI:13-1093/TE.20111011.2016.007
Yang Ning, Chen Zhongying, Li Songbai, . Application of X80 large deflection steel in the pipeline construction in seismic fault zone[J]. Oil & Gas Storage and Transportation, 2011, 30(10): 754-755. DOI: CNKI:13-1093/TE.20111011.2016.007
Citation: Yang Ning, Chen Zhongying, Li Songbai, . Application of X80 large deflection steel in the pipeline construction in seismic fault zone[J]. Oil & Gas Storage and Transportation, 2011, 30(10): 754-755. DOI: CNKI:13-1093/TE.20111011.2016.007

X80大变形钢在地震断裂带施工中的应用

Application of X80 large deflection steel in the pipeline construction in seismic fault zone

  • 摘要: 西气东输二线管道工程西段经过地震断裂带易造成管道失效,为了解决该问题,将X80大变形钢应用于管道施工。与传统加大管道壁厚的方式相比较,该工程采用基于应变的设计方法,制订了“先单面成沟,沟下组焊,再开挖另一侧边坡”的主要施工流程,采用“RMD根焊+药芯焊丝填充盖面焊接”工艺对大变形钢管进行焊接。结果表明:X80大变形钢管满足抗震要求,不仅节省了工程成本,而且施工方法有效解决了高坡比、宽管沟等施工问题,一次焊接合格率达到98%。

     

    Abstract: Considering the possibility of pipe fracture in the construction of West-to-East Parallel Gas Transmission Pipeline Project passing through the seismic fault zone, X80 large deflection steel was applied in order to offset the fracture. Compared with the traditional method in increasing pipeline wall thickness, the strain-based design method was introduced into the project. The main construction procedures were consisted of "digging trench from one side+ combination welding in ditch + digging the other side". The technique of "RMD root bead + flux-cored wire cosmetic bead" was used in the large deflection welding technology. Results showed that X80 large deflection steel pipe could satisfy the anti-seismic requirements and decreased the project costs. The construction method effectively solved the problems existed in the high slope rate and wide trench. The pass percent of one-round welding reached at 98%.

     

/