Abstract:
A comparison between СНиП Ⅲ-42-80* and GB 50369-2006 is given on the general requirements, groove line-up and welding, inspection and acceptance of welds, excavation, lowering in, crossing or overhead crossing, pigging and hydrotest. It is pointed out that a certain lag existed in СНиП Ⅲ-42-80* since it had continually been used from the 1987's amendment to now. Besides, GB 50369-2006 was more practical and consistent with China's current industrial level and pipeline construction status. Based on the analysis results, an amendment on GB 50369-2006 are proposed, including the relative technology requirements to be added on pipe laying, line-up, position of crosswise pipe joints in overhead crossing project and determination of hydrotest medium for mountainous pipe sections.